BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 2/27/2020 | 2/28/2020 | 2/28/2020 | P | CANC |
Tell Riley
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2020 | 2/27/2020 | 2/27/2020 | A | NR |
Tell Riley
|
|
|
Josh Phone #: ###-####//correction notice issued//need to lower egress window//fire block concealed space//air seal//plan mod for changes and beam calcs and address cut beam at end//need mechanical permit//
|
Plan Modification Accepted | | | 2/27/2020 | | DONE |
|
|
|
Plan mod to relay out the floor plan
|
Plan assigned to (M_H) | 2/27/2020 | | 2/27/2020 | | DONE |
Michael Hanson
|
|
|
See new floor plan.
|
Routing - PLAN CHECK | 2/27/2020 | | 2/27/2020 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 2/27/2020 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 2/27/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/1/2019 | 11/1/2019 | 11/1/2019 | A | PASS |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 11/1/2019 | | 11/1/2019 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 11/1/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2019 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 11/1/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/1/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/1/2019 | | DONE |
|
|
|
|
Meeting | | | 11/1/2019 | | DONE |
|
|
|
need to see/verify warrinty deed between Chapman and Wownow, and between wownow and Tolson.
|
Application received | | 11/1/2019 | | | |
|
|
|
|