Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04498
StatusFinaled
Name VERTICAL CORP
Site Address 1030 W RIVER ST
Project NameBiomark Annex
Customer Number 
ePlanReviewYes
Description
(BIOMARK ANNEX – FABRICATION AND STORAGE) (CZC19-00261) The fire sprinkler system is used for building area increase. To remodel an existing 12,644 square foot tenant space (11,400 square foot lower level and 1,244 square foot mezzanine) for a new fabrication, assembly of parts, and storage tenant. Work is to include interior full height steel stud nonbearing walls with steel headers over door and window openings, interior side-hinged swinging doors, interior overhead doors, interior windows, interior partial height masonry walls, a gypsum board ceiling at the top of the new masonry walls, suspended acoustical ceilings, three existing toilet rooms maintained accessible to the disabled, millwork, and finishes. Special Inspection is required for masonry and for anchors post-installed in masonry and/or hardened concrete. Racks over 8 feet tall require a separate racking permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/14/20208/4/2020 DONE
This permit finaled on the web by Todd Weltner
Second Notice 5/17/20207/9/2020 DONE
mailed 7-9-2020
First Notice 4/23/20205/7/2020 DONE
mailed 5-8-2020
Permanent Occupancy  4/13/2020 DONE
BLD-Final4/7/20204/8/20204/8/2020PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Todd Weltner
FIRE-Final Inspection4/7/20204/8/20204/8/2020APASS
DetailsJim Page
Fire sprinkler inspections (two different FIR permits for sprinkler modifications), no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.

Phone #: ###-#### Inspection requested via web by Todd Weltner
BLD-Ceiling Grid Inspection4/6/20204/7/20204/7/2020PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Todd Weltner
BLD-Framing/Rough-in2/3/20202/3/20202/3/2020PPASS
DetailsDave Hannah
Kent Phone #: ###-####
BLD-Framing/Rough-in1/30/20201/31/20201/31/2020AFAIL
DetailsDave Hannah
KENT Phone #: ###-#### framing see details framing conections to cmu walls and roof
Issue PAID IN FULL permit  1/15/2020 DONE
Print Occupancy Form  1/15/2020 DONE
Plan assigned to (CJW)11/21/201912/18/20191/9/2020 PASS
DetailsCarl Westfall
(1st done) 12/11/19 (L-3 - 15 days) (eplan - 24 sheets) Biomark Annex (back to applicant)
Routing - PLAN CHECK1/8/2020 1/9/2020 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  1/9/2020 DONE
Permit Ready to Issue  1/9/2020 DONE
all met: todd@vertical-corp.com

Need
GC Form
Revised cert of value
Plan resubmittals received  1/8/2020 DONE
Route to Impact Fee Review12/24/201912/27/201912/26/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE11/21/201911/21/201912/23/2019 PASS
DetailsErika Akin
Attached comments to case
1st review completed  12/23/2019 DONE
Plan resubmittals requested  12/23/2019 DONE
Routing - PLAN CHECK11/21/2019 12/23/2019 FAIL
DetailsCarl Westfall
Routing PW Environmental11/22/2019 12/10/2019 PASS
DetailsRick Christenson
Routing - MECHANICAL11/21/2019 11/26/2019 PASS
DetailsTroy James
Routing - PLANNING11/21/2019 11/26/2019 PASS
DetailsKarla Nelson
Routing - Addressing11/21/2019 11/22/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/21/2019 11/22/2019 PASS
DetailsMorgan Webb
Routing - PLUMBING11/21/2019 11/22/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  11/20/2019 PASS
Intake Approval  11/19/2019 FAIL
DetailsJulie Romig
Need:
1. Form 310 for Special Inspections, stamped/signed by the structural engineer.
2. Provide structural engineer's stamp/signature for structural details shown on A6.02.
Application received  11/12/2019 DONE
Application submitted via PDS Online on Nov 12 2019 1:15PM