BLD-Foundation | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PASS |
Tell Riley
|
|
|
Pat - */Screened*/ Phone #: ###-####
|
BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | PART |
Tell Riley
|
|
|
SCREENED // Pat Phone #: ###-####//ok per plans//setbacks verified by record of survey points and measurements from existing house as per the survey provided by the general contractor and the approved plans//
|
Issue PAID IN FULL permit | | | 7/31/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/28/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/7/2020 | 7/7/2020 | 7/28/2020 | | PASS |
Josh Bogle
|
|
|
07/13 addition - 1st done
|
Plan Reviewer's activity | | | 7/28/2020 | | DONE |
Josh Bogle
|
|
|
rejected resubmittal -plans not versioned correctly
|
Routing - PLAN CHECK | 7/28/2020 | | 7/28/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 7/28/2020 | | DONE |
|
|
|
all met: david@bluebirdbuilding.net
NEED
RP
|
Routing - PLAN CHECK | 7/7/2020 | | 7/23/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
1st review completed | | | 7/23/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 7/7/2020 | | 7/8/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (Zoning) | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | FAIL |
Jeff Lowe
|
|
|
Setbacks not met for side due to plat note
|
Routing Walk-In (BLD) | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Routing - PLAN CHECK | 11/12/2019 | | 11/12/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 11/12/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 11/12/2019 | | | |
|
|
|
|