Permit Information
Permit NumberBLD19-04651
StatusFinaled
Name RIVER BROOK CUSTOM HOMES INC
Site Address 5539 W SPAULDING ST
Project Name5539 W. Spaulding
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2160 sq. ft., two story (first story 1082 sq. ft., second story 1078 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 47 sq. ft. of covered patio/porch and a 632 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20207/24/20207/24/2020PPASS
DetailsDave Hannah
*Screened* Damon, call for access code Phone #: ###-####
DOC - Permit Finaled7/24/20207/24/20207/24/2020PPASS
DetailsDave Hannah
BLD-Blower Door Test Results7/23/20207/23/20207/23/2020PNR
DetailsTell Riley
BLD-Final7/22/20207/23/20207/23/2020PNR
DetailsTell Riley
Damin *screened* Phone #: ###-####
BLD-Conference7/15/20207/15/20207/15/2020PDONE
DetailsTell Riley
call if needed- damon *screened* Phone #: ###-####//questions on steps//step at garage/dwelling separation door need to be even height risers--currently 6,6 and 4//landing at front egress door needs to be min 36" in direction of travel//
BLD-Conference6/26/20206/26/20206/26/2020PDONE
DetailsTell Riley
Screened // Mark Phone #: ###-####
BLD-Framing/Rough-in6/19/20206/19/20206/19/2020PFAIL
DetailsTell Riley
Amy Phone #: ###-####//engineering provided for roof accent on front of home//framing does not meet the requirements of the engineering for size, material, and bearing//
BLD-Energy code compliance4/20/20204/23/20204/23/2020ACANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//inspection was already completed//appears fees are still due//
BLD-Energy code compliance4/21/20204/22/20204/21/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//updated Rescheck was provided for energy trade offs//the insulation and windows are now compliant with the rescheck trade off values//report provided by designer//
BLD-Energy code compliance4/20/20204/20/20204/21/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//insulation values do not meet the rescheck documents used to trade off window values that do not meet code minimum//re-inspection will require a re-inspection fee//
BLD-Energy code compliance4/17/20204/20/20204/20/2020AFAIL
DetailsTell Riley
Damon Phone #: ###-####//CN still posted//windows U values do not meet prescriptive requirements, ceiling R values do not meet prescriptive requirements//
BLD-Energy code compliance4/17/20204/17/20204/17/2020PFAIL
DetailsTell Riley
need to use R49 batts in attic, R38 used//window u values do not meet code minimum//possible use res check to trade off //
BLD-Framing/Rough-in4/16/20204/17/20204/17/2020PPART
DetailsTell Riley
Screened- DAMION Phone #: ###-####//joist repair ok, discussed with BCI engineer on phone//swooped roof still pending approval//
BLD-Framing/Rough-in4/15/20204/16/20204/16/2020APART
DetailsTell Riley
framer there now should be done today by 3 pm. Phone #: ###-#### Inspection requested via web by Damion Jordan//repair for notched joist needs to match fix and use correct hangers//framing at swoop near front porch still does not reflect the details on plans-need to use 2x material for rim and ledger-1/2" osb was used// ok to insulate only//
BLD-Framing/Rough-in4/9/20204/10/20204/10/2020PFAIL
DetailsTell Riley
Daiman *cleared* Phone #: ###-####//see plans and bmc calcs for corretions//
BLD-Wall Bracing4/7/20204/7/20204/7/2020PPART
DetailsTell Riley
screened - cough is a side affect of blood pressure medication // Damion Phone #: ###-####//ok, still will need to shear inside of walls near bonus room//
BLD-Wall Bracing4/2/20204/2/20204/2/2020PCANC
DetailsBrandon Shaw
Inspection terminated due to contractor not adhering to the 6' social distancing guideline set by the CDC...
BLD-Framing/Rough-in4/1/20204/2/20204/2/2020PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan
BLD-Wall Bracing3/6/20203/6/20203/6/2020APART
DetailsTell Riley
need to add galvanized nails to PT//need to shear 2nd story walls plate to plate discussed onsite//some walls may need to be sheathed on the inside/
BLD-Framing/Rough-in3/4/20203/6/20203/6/2020ACANC
DetailsTell Riley
Shear // Damion Phone #: ###-####
BLD-Foundation1/23/20201/24/20201/24/2020APART
DetailsTell Riley
Damion Phone #: ###-####//WIP//
BLD-Footing1/21/20201/23/20201/23/2020APASS
DetailsTell Riley
late am // Damon Phone #: ###-####//setbacks tight on sides--will recheck at wall inspection//rebar installed per plans//
Issue PAID IN FULL permit  1/14/2020 DONE
Inspection Record Card- Bld  1/14/2020 DONE
OVERRIDE  12/17/2019  
Plan assigned to (J_N)12/13/201912/13/201912/17/2019 DONE
DetailsJenny Nelson
12/19 sfd L1 ePlan. 1st review complete, waiting for planning - Sue sent to Nicolette for planning review
Routing - PLANNING12/13/2019 12/17/2019 PASS
DetailsNicolette Womack
Uploaded Recorded Shared Driveway Easement into ePlan Docs
1st review completed  12/17/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  12/17/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  12/17/2019 DONE
NEED GC FORM
Routing - PLAN CHECK12/6/2019 12/13/2019 PASS
DetailsJenny Nelson
Route to Impact Fee Review12/6/201912/9/201912/9/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL12/6/2019 12/9/2019 PASS
DetailsTroy James
Routing - PLANNING12/6/2019 12/9/2019 FAIL
DetailsSue Cummings
This is parcel C of ROS 11265 which does not show a rear access. I sent to Nicolette
Routing - Addressing12/6/2019 12/9/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/6/2019 12/9/2019 PASS
DetailsCandy A. Nichols
Plans ACCEPTED BY PLAN TECH  12/6/2019 DONE
Recd Pcfee & Taken To Pln CK  12/6/2019 DONE
Intake Approval  12/6/2019 PASS
Intake Approval  12/5/2019 FAIL
2nd prescreen: Reserve the bottom right corner for City approval stamps - leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block (move the wall section on your cover sheet). Correct the address on the Manual J (not in the city of Meridian). Indicate the locations of crawl space and attic access. Need building section. Show mechanicals.
Intake Approval  11/22/2019 FAIL
Reserve the bottom right corner for City approval stamps - leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block. Need Manual J. Indicate the locations of crawl space and attic access. Need building section. Show mechanicals.
Application received  11/21/2019 DONE
Application submitted via PDS Online on Nov 21 2019 5:54PM