Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
Third Notice | | 5/12/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | 4/1/2020 | 4/1/2020 | 4/3/2020 | | DONE |
Brandon Shaw
|
|
|
mailed 4-6-2020
|
Permanent Occupancy | | | 4/2/2020 | | DONE |
|
|
|
|
BLD-Final | 3/31/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
Brandon Shaw
|
|
|
john Phone #: ###-####
|
DOC - Permit Finaled | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, stand-alone duct detector (FIR20-00210) is complete with no other fire alarm devices, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.
John Phone #: ###-####
|
Zoning Approval | 3/30/2020 | 3/30/2020 | 3/30/2020 | | DONE |
Michaella Owens
|
|
|
|
FIRE-Conference | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | DONE |
Jim Page
|
|
|
Fire conference is complete, large HVAC unit is 4000CFM according to the HVAC contractor. HVAC untis that 2001CFM and higher requires smoke detection for HVAC unit shutdown with remote annunciator. A seperate FIR permit is required for smoke detector install.
Johnathon Phone #: ###-####
|
BLD-Framing/Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PEND |
Brandon Shaw
|
|
|
OK to cover around doorways... Bathroom cover pending Mec cover approval...
|
OVERRIDE | | | 3/9/2020 | | |
|
|
|
|
Plan assigned to (JAR) | 2/19/2020 | 2/19/2020 | 3/9/2020 | | DONE |
Julie Romig
|
|
|
03/09 (10 days) Plan mod #1 removed bathroom RM 110 from scope. Relocate drinking fountain to wall adjacent to shower 1 RM 108. Removed existing mop sink at MOP Area RM 11. Updated plumbing schedule accordingly. Updated Mech duct run, Switched to alternate existing rooftop unit, Modified supply/ruturn ducts at open space. Updated lighting: linear LEDs to round recessed LEDs to Pendant LEDs. Remove skylights from scope of work
G0.01, G0.03 A2.11, A2.51 M1.00 M2.00 P1.00 P2.00 E2.0L E3.1
|
CHANGE STATUS TO (ISS) | | | 3/9/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/9/2020 | | DONE |
|
|
|
PLAN MOD DO NOT REISSUE
|
Routing - PLAN CHECK | 2/25/2020 | | 3/6/2020 | | PASS |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 2/25/2020 | | 2/27/2020 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 2/25/2020 | | 2/26/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR DEMO-NO FEES DUE-PLAN MOD-REFUND TO BE ISSUED
|
Routing - PLUMBING | 2/25/2020 | | 2/25/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Plan Modification Accepted | | | 2/19/2020 | | DONE |
|
|
|
Plan mod #1 removed bathroom RM 110 from scope. Relocate drinking fountain to wall adjacent to shower 1 RM 108. Removed existing mop sink at MOP Area RM 11. Updated plumbing schedule accordingly. Updated Mech duct run, Switched to alternate existing rooftop unit, Modified supply/ruturn ducts at open space. Updated lighting: linear LEDs to round recessed LEDs to Pendant LEDs. Remove skylights from scope of work
|
Issue PAID IN FULL permit | | | 2/3/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/3/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/31/2020 | | |
|
|
|
|
Plan assigned to (JAR) | 12/4/2019 | 12/4/2019 | 1/31/2020 | | DONE |
Julie Romig
|
|
|
01/30 - 2nd Rev - 1st Rev Comp - L3 Virtus
|
Routing - PLAN CHECK | 1/23/2020 | | 1/31/2020 | | PASS |
Julie Romig
|
|
|
2nd Rev
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/31/2020 | | DONE |
|
|
|
ALL MET
NEED
GC
Revised Certificate of Value
RP
|
Routing - PLUMBING | 1/23/2020 | | 1/27/2020 | | PASS |
Dan Ediger
|
|
|
Per Plans and ISPC
|
Routing - PLANNING | 1/23/2020 | | 1/24/2020 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Design Review | 1/23/2020 | | 1/24/2020 | | PEND |
Michaella Owens
|
|
|
corrections required
|
Routing - MECHANICAL | 1/23/2020 | | 1/24/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 1/13/2020 | 1/16/2020 | 1/14/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - MECHANICAL | 12/4/2019 | | 1/14/2020 | | FAIL |
Chad Schwendiman
|
|
|
Changemark on plans, report in documents
|
1st review completed | | | 1/14/2020 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 12/4/2019 | 12/4/2019 | 1/13/2020 | | PASS |
Erika Akin
|
|
|
Attasched comments to case
|
Routing - Design Review | 12/4/2019 | | 1/13/2020 | | PASS |
Michaella Owens
|
|
|
|
Routing - PLAN CHECK | 12/4/2019 | | 1/13/2020 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING | 12/4/2019 | | 12/10/2019 | | FAIL |
Nicolette Womack
|
|
|
CUP19-00060 requires abandoning the existing drive-up window prior to issuance of building permit.
|
Routing - Addressing | 12/4/2019 | | 12/5/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2019 | | 12/4/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/4/2019 | | 12/4/2019 | | PASS |
Michael Zawacki
|
|
|
waiver approved.
|
Intake Approval | | | 11/29/2019 | | PASS |
|
|
|
|
Application received | | | 11/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 22 2019 2:34PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|
Routing - PLUMBING | 12/4/2019 | | | | PASS |
Dan Ediger
|
|
|
With notes
|