BLD-Energy code compliance | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Tell Riley
|
|
|
Brian *screened* Phone #: ###-####//ok per plans, add insulation at cavity above windows//steps--got 2nd opinion from supervisor, ok to leave, not many other options//
|
BLD-Framing/Rough-in | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Tell Riley
|
|
|
Bryan - will call Tell to determine if virtual inspection is appropriate Phone #: ###-####//ok to insulate, need to figure out steps at cut in doorway//
|
BLD-Wall Bracing | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Tell Riley
|
|
|
Brian Phone #: ###-####//shear corrections made, engineers letter provided for corrections//
|
BLD-Framing/Rough-in | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | NR |
Tell Riley
|
|
|
Brian *left voicemail for addition framing** Phone #: ###-####//need approval from engineer for strapping in wrong locations//
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PART |
Tell Riley
|
|
|
Brian Phone #: ###-####//interior shear wall only//will need to see verification that hold downs were installed//
|
Case Summary (BLD) | | | 2/4/2020 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/4/2020 | | 2/4/2020 | | PASS |
Josh Bogle
|
|
|
min. PR fee, 1 hr
|
Permit Ready to Issue | | | 2/4/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/4/2020 | | DONE |
|
|
|
|
BLD-Foundation | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PART |
Tell Riley
|
|
|
Brian Phone #: ###-####//outside of garage piers//rebar ok, added ties and j-verts-ok per conversation with design engineer//specials were done for epoxy rebar//pend specials required for concrete on #310 form//
|
BLD-Conference | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | DONE |
Tell Riley
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PEND |
Tell Riley
|
|
|
Brian Phone #: ###-####//bolts and rebar will need to be approved by engineer, no j hooks on verts, ties difer from plan, and bolts have no bend or washer nut, most bar is welded an not tied// specials for concrete and formwork//pend engineers approval and specials//
|
BLD-Conference | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | DONE |
Tell Riley
|
|
|
Brian Phone #: ###-####//phone conversation about smoke detector locations and installation for exisitng dwelling//
|
Routing Walk-In (BLD) | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/11/2019 | | 12/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/11/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 12/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 12/3/2019 | 12/3/2019 | 12/3/2019 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 12/3/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/3/2019 | | 12/3/2019 | | FAIL |
Josh Bogle
|
|
|
needs existing floor plan, #310 form
|
1st review completed | | | 12/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 12/3/2019 | | | |
|
|
|
|