BLD-Wall cover | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Tony Young
|
|
|
Inspecting beam change(was installed upside down) and connectors at back patio. Phone #: ###-#### Inspection requested via web by Chad Aland
|
BLD-Wall Bracing | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PART |
Tony Young
|
|
|
Please call chad prior to inspection. Phone #: ###-#### Inspection requested via web by Chad Aland// garage ok after minor fixes
|
BLD-Energy code compliance | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Tony Young
|
|
|
Call Chad before arriving if possible. 208.994.2805 Phone #: ###-#### Inspection requested via web by Chad Aland// ..,, inside of house ok,, back patio not approved,, needs beam approved as built or turned over and connections
|
BLD-Energy code compliance | 4/1/2020 | 4/1/2020 | 4/1/2020 | A | PART |
Tony Young
|
|
|
was not ready yesterday...,, inside of house ok,, back patio not approved,, needs beam approved as built or turned over and connections
|
BLD-Energy code compliance | 3/30/2020 | 3/31/2020 | 3/31/2020 | P | NR |
Tell Riley
|
|
|
Please call chad prior to inspection Plans are in the fireplace Phone #: ###-#### Inspection requested via web by Chad Aland//not ready at time of inspection//will call back in//told Chad it was ok to stock gyp board//
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PART |
Dave Hannah
|
|
|
Please call Chad prior to inspection Phone #: ###-#### Inspection requested via web by Chad Aland ok to insulate but need to check beams and headers at energy
|
BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Chad Aland. Mech rough in inspection has failed.
|
BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | NR |
Dave Hannah
|
|
|
Chad Phone #: ###-#### two red tags on window one r elec and one mec and i needs a full set of truss engin eering on site
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | CANC |
Dave Hannah
|
|
|
stem wall // Willie Phone #: ###-####
|
BLD-Foundation | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PART |
Tell Riley
|
|
|
wILLIE Phone #: ###-####//Zoning cert found, setbacks per plans, added bar in footing areas//
|
Plan Reviewer's activity | | | 3/12/2020 | | DONE |
Jenny Nelson
|
|
|
Detached 1300 garage under CZC20-00024
|
BLD-Wall Bracing | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Tony Young
|
|
|
Inspection requested via web by Chad Aland
|
BLD-Foundation | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Tony Young
|
|
|
stem wall // Willy Phone #: ###-####
|
BLD-Framing/Rough-in | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | NR |
Tony Young
|
|
|
stem wall // Willy Phone #: ###-####// not a frame,, foundation ok
|
BLD-Footing | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Dave Hannah
|
|
|
willie Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/28/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2020 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2020 | | |
|
|
|
emailed permit to be sign to- chadaland@gmail.com EPLAN needs to be released
|
OVERRIDE | | | 1/21/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 12/6/2019 | 12/6/2019 | 1/21/2020 | | DONE |
Jenny Nelson
|
|
|
12/19 sfd L1 ePlan. 1st complete, need framing plans, chimney foundation, covered patio
|
Routing - PLAN CHECK | 1/21/2020 | | 1/21/2020 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2020 | | DONE |
Jenny Nelson
|
|
|
1-hour plan check fee
|
Permit Ready to Issue | | | 1/21/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 1/14/2020 | | 1/14/2020 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 12/23/2019 | | 1/2/2020 | | PASS |
Sue Cummings
|
|
|
The 2 driveways need 5 ft. separation, min. Shed not a part? Shed needs Zoning Certificated prior to construction
|
Routing - PLAN CHECK | 12/23/2019 | | 12/23/2019 | | FAIL |
Jenny Nelson
|
|
|
Masonry chimney requires foundation, need engineering for covered patio that extends beyond house, specify floor framing and show girder trusses
|
1st review completed | | | 12/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 12/11/2019 | | 12/11/2019 | | PASS |
Troy James
|
|
|
Need to sign off in eplan. Waiting for a task.
|
Routing - PLAN CHECK | 12/6/2019 | | 12/11/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 12/6/2019 | 12/9/2019 | 12/9/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 12/6/2019 | | 12/9/2019 | | FAIL |
Troy James
|
|
|
emailed corrections to legends mech
|
Routing - PLANNING | 12/6/2019 | | 12/6/2019 | | FAIL |
Sue Cummings
|
|
|
Accessory strutures over 1,000 sf. require a Zoning Certificate prior to obtaining a bld permit. Driveway access is required to be located on the east side of the lot as per plat, and existing concrete. Show driveway to the shop.
|
Routing - Addressing | 12/6/2019 | | 12/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/6/2019 | | 12/6/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/6/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/5/2019 | | FAIL |
|
|
|
need 2015 IECC on RESCheck
|
Application received | | | 12/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2019 3:24PM
|