Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04742
StatusIssued
Name EDGETEK CONSTRUCTION LLC
Site Address 10990 W FAIRVIEW AVE
Project NameLupo Motors parking garage
Customer Number 
ePlanReviewYes
Description
(LUPO MOTORS - PARKING GARAGE ADDITION) ***Existing doors in main building to have hardware upgraded to meet accessible upgrade requirements*** This building is not fire sprinkled. Permit to enclose an existing 560 sqft. covered drive-thru awning at a recently converted bank to car dealership building. Work to include: new foundation and other structural elements, four new roll up doors, storefront glazing on west side, one set of double doors, exterior finishes, mechanical work, and electrical work. Approval is contingent on adhering to the approved plans, notations, engineering, and local codes and ordinances. This space is unheated and unconditioned if heating or conditioning is added in the future a building permit will be required to upgrade the building envelope. The use of this space to contain running vehicles is prohibited, only the driving in, parking, and driving out of vehicles is permitted, no idling allowed. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/6/20208/7/20208/7/2020PPASS
DetailsTell Riley
David Baldwin on site contact Phone #: ###-#### Inspection requested via web by Ron Ramza//door framing per plans//
BLD-Framing/Rough-in7/10/20207/13/20207/13/2020PPASS
DetailsTell Riley
Don onsite contact ###-#### or David ###-#### Phone #: ###-#### Inspection requested via web by Ron Ramza//framing appears to be ok per plans//added header for support//wleding special inspection provided//all electrical will surface mount//ok for wall cover only//
BLD-Final7/7/20207/8/20207/8/2020PCANC
DetailsTell Riley
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####.

Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza//i believe this is the wrong permit, as a framing was canceled yesterday//final should have been for the main building, that permit is under review for a plan mod//let contact know the plan mod needs completed//
FIRE-Final Inspection7/7/20207/8/20207/8/2020AFAIL
DetailsTroy Cobbley
Wrong inspection called in.

Don Baldwin onsite contact for access business open at 8:30 AM. ###-####. If earlier, please call Don. He is driving in from Garden Valley.

Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza
BLD-Framing/Rough-in7/2/20207/7/20207/7/2020PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ron Ramza
BLD-Foundation5/21/20205/26/20205/26/2020APASS
DetailsMike Jordan
Onsite Contact David 208--###-#### Phone #: ###-#### Inspection requested via web by Ron Ramza. Stemwall ok. Also reviewed special inspection report for welding.
BLD-Footing5/7/20205/8/20205/8/2020APASS
DetailsMike Jordan
David on-site
Contact 830.0212. Phone #: ###-#### Inspection requested via web by Ron Ramza. All issues with new engineering have been resolved. Reviewed special inspection report for epoxy dowelling as well. Ok to place concrete in footing.
CHANGE STATUS TO (ISS)  5/7/2020 DONE
Plan assigned to (M_H)4/23/2020 5/4/2020 DONE
DetailsMichael Hanson
05/05 Plan mod - Lupo Motors
Routing - PLAN CHECK5/4/2020 5/4/2020 PASS
DetailsMichael Hanson
Plan mod review fee = 1 hour
PLANS/APPL TAKEN TO FRONT DESK  5/4/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  5/4/2020 DONE
do not issue- plan mod
Intake Approval  4/29/2020 FAIL
DetailsMichael Hanson
04/29/2020
Provide new coversheet with sheet index amended to show new sheet.
Provide direction to new sheet A1.2 on A1.1.
Provide update in revision area of titleblock.
With these updates I will be able to approve the prescreen and the review.
Thank You.
-----------------------------------------------------------------
Provide updated floor plans showing new structural requirements.
Intake Approval  4/27/2020 FAIL
DetailsMichael Hanson
Provide updated floor plans showing new structural requirements.
Plan Modification Accepted  4/23/2020 DONE
modify the existing columns and footings, form 310
BLD-Footing4/21/20204/22/20204/22/2020APEND
DetailsTell Riley
screened // David Phone #: ###-####//need ro resubmit new engineering for change in design and specify which footings/columns have changed//approved plans/engineering show new columns, piers and footings//new engineering shows built up footings around west end footings//please specify actual location of new design and where existing footings/columns are to remain//pending city approval//
BLD-Footing4/15/20204/21/20204/21/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Ron Ramza//need approved plans and engineering onsite//
Issue PAID IN FULL permit  4/8/2020 DONE
Print Occupancy Form  4/8/2020 DONE
Routing - PLANNING2/11/2020 2/11/2020 PASS
DetailsNicolette Womack
Permit Ready to Issue  2/11/2020 DONE
all met: davidbaldwin1988@gmail.com

Need
ACHD
GC Form
Revised Cert of Value
Plan assigned to (M_H)12/24/2019 2/11/2020 DONE
DetailsMichael Hanson
3rd review completed - 01/15 #520 L3 ePlan - Lupo Motors - pending planning Feb. 4th.
Routing - PLAN CHECK1/24/2020 1/24/2020 PASS
DetailsMichael Hanson
Routing - PLANNING1/24/2020 1/24/2020 FAIL
DetailsNicolette Womack
Ordinance Readings are incomplete. Will be completed February 4th.
Routing - PLAN CHECK1/21/2020 1/21/2020 FAIL
DetailsMichael Hanson
See building plan review report for corrections required.
Routing - PLANNING1/21/2020 1/21/2020 FAIL
DetailsNicolette Womack
Ordinance Readings are incomplete. Will be completed February 4th.
Route to Impact Fee Review1/15/20201/18/20201/16/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE12/24/201912/24/20191/15/2020 PASS
DetailsErika Akin
No new comments. No change to fire flow calculation area or FD access. Fire extinguisher in garage area shown on plan sheet A1.1. Inspector to field verify.
1st review completed  1/15/2020 FAIL
DetailsMichael Hanson
Routing - PLAN CHECK12/24/2019 1/13/2020 FAIL
DetailsMichael Hanson
See building plan review report for corrections required.
Routing PW Street Lights12/24/2019 1/6/2020 PASS
DetailsTom Marshall
Routing PW Solid Waste12/24/2019 1/2/2020 PASS
DetailsEvan Carpenter
Routing - PLANNING12/24/2019 12/30/2019 FAIL
DetailsNicolette Womack
Ordinance readings for rezone must be completed, expected by end of January.
Routing - Design Review12/24/2019 12/30/2019 PASS
DetailsJosh Wilson
Routing - Erosion and Sediment12/24/2019 12/27/2019 PASS
DetailsAndy J. Long
No ESC permit required.
Routing - MECHANICAL12/24/2019 12/26/2019 PASS
DetailsChad Schwendiman
No Mechancial drawings required at this time.
Routing PW Sewer Design12/24/2019 12/24/2019 PASS
DetailsDeAnn Brown
Building already connected to sewer. No new fixtures.
Routing - Addressing12/24/2019 12/24/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/24/2019 12/24/2019 PASS
DetailsMorgan Webb
Routing PW Drainage12/24/2019 12/24/2019 PASS
DetailsBrian Murphy
less1000 square new
Intake Approval  12/19/2019 PASS
Intake Approval  12/12/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
•The following item did not get addressed, Per checklist provide site specific fire flow at hydrants letter from Suez Water or other public water provider (since this is a single check box in the checklist this item is required)
• The following item did not get addressed, Per checklist provide and show location of the fire extinguishers and per the required locations of the 2015 IBC section 906.1
Intake Approval  12/5/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• Per checklist provide site specific fire flow at hydrants letter from Suez Water or other public water provider
• Provide mechanical plans for the new repair garage or provide an email transcript from mechanical supervisor Chad Schwendiman stating no mechanical plans required.
• Per checklist provide and show location of the fire extinguishers.
Application received  12/4/2019 DONE