BLD-Framing/Rough-in | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Tell Riley
|
|
|
David Baldwin on site contact Phone #: ###-#### Inspection requested via web by Ron Ramza//door framing per plans//
|
BLD-Framing/Rough-in | 7/10/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Tell Riley
|
|
|
Don onsite contact ###-#### or David ###-#### Phone #: ###-#### Inspection requested via web by Ron Ramza//framing appears to be ok per plans//added header for support//wleding special inspection provided//all electrical will surface mount//ok for wall cover only//
|
BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | P | CANC |
Tell Riley
|
|
|
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####.
Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza//i believe this is the wrong permit, as a framing was canceled yesterday//final should have been for the main building, that permit is under review for a plan mod//let contact know the plan mod needs completed//
|
FIRE-Final Inspection | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | FAIL |
Troy Cobbley
|
|
|
Wrong inspection called in.
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####. If earlier, please call Don. He is driving in from Garden Valley.
Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza
|
BLD-Framing/Rough-in | 7/2/2020 | 7/7/2020 | 7/7/2020 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Ramza
|
BLD-Foundation | 5/21/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
Mike Jordan
|
|
|
Onsite Contact David 208--###-#### Phone #: ###-#### Inspection requested via web by Ron Ramza. Stemwall ok. Also reviewed special inspection report for welding.
|
BLD-Footing | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Mike Jordan
|
|
|
David on-site Contact 830.0212. Phone #: ###-#### Inspection requested via web by Ron Ramza. All issues with new engineering have been resolved. Reviewed special inspection report for epoxy dowelling as well. Ok to place concrete in footing.
|
CHANGE STATUS TO (ISS) | | | 5/7/2020 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 4/23/2020 | | 5/4/2020 | | DONE |
Michael Hanson
|
|
|
05/05 Plan mod - Lupo Motors
|
Routing - PLAN CHECK | 5/4/2020 | | 5/4/2020 | | PASS |
Michael Hanson
|
|
|
Plan mod review fee = 1 hour
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/4/2020 | | DONE |
|
|
|
do not issue- plan mod
|
Intake Approval | | | 4/29/2020 | | FAIL |
Michael Hanson
|
|
|
04/29/2020
Provide new coversheet with sheet index amended to show new sheet.
Provide direction to new sheet A1.2 on A1.1.
Provide update in revision area of titleblock.
With these updates I will be able to approve the prescreen and the review.
Thank You.
-----------------------------------------------------------------
Provide updated floor plans showing new structural requirements.
|
Intake Approval | | | 4/27/2020 | | FAIL |
Michael Hanson
|
|
|
Provide updated floor plans showing new structural requirements.
|
Plan Modification Accepted | | | 4/23/2020 | | DONE |
|
|
|
modify the existing columns and footings, form 310
|
BLD-Footing | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PEND |
Tell Riley
|
|
|
screened // David Phone #: ###-####//need ro resubmit new engineering for change in design and specify which footings/columns have changed//approved plans/engineering show new columns, piers and footings//new engineering shows built up footings around west end footings//please specify actual location of new design and where existing footings/columns are to remain//pending city approval//
|
BLD-Footing | 4/15/2020 | 4/21/2020 | 4/21/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Ramza//need approved plans and engineering onsite//
|
Issue PAID IN FULL permit | | | 4/8/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/8/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 2/11/2020 | | 2/11/2020 | | PASS |
Nicolette Womack
|
|
|
|
Permit Ready to Issue | | | 2/11/2020 | | DONE |
|
|
|
all met: davidbaldwin1988@gmail.com
Need
ACHD
GC Form
Revised Cert of Value
|
Plan assigned to (M_H) | 12/24/2019 | | 2/11/2020 | | DONE |
Michael Hanson
|
|
|
3rd review completed - 01/15 #520 L3 ePlan - Lupo Motors - pending planning Feb. 4th.
|
Routing - PLAN CHECK | 1/24/2020 | | 1/24/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 1/24/2020 | | 1/24/2020 | | FAIL |
Nicolette Womack
|
|
|
Ordinance Readings are incomplete. Will be completed February 4th.
|
Routing - PLAN CHECK | 1/21/2020 | | 1/21/2020 | | FAIL |
Michael Hanson
|
|
|
See building plan review report for corrections required.
|
Routing - PLANNING | 1/21/2020 | | 1/21/2020 | | FAIL |
Nicolette Womack
|
|
|
Ordinance Readings are incomplete. Will be completed February 4th.
|
Route to Impact Fee Review | 1/15/2020 | 1/18/2020 | 1/16/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 12/24/2019 | 12/24/2019 | 1/15/2020 | | PASS |
Erika Akin
|
|
|
No new comments. No change to fire flow calculation area or FD access. Fire extinguisher in garage area shown on plan sheet A1.1. Inspector to field verify.
|
1st review completed | | | 1/15/2020 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 12/24/2019 | | 1/13/2020 | | FAIL |
Michael Hanson
|
|
|
See building plan review report for corrections required.
|
Routing PW Street Lights | 12/24/2019 | | 1/6/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 12/24/2019 | | 1/2/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 12/24/2019 | | 12/30/2019 | | FAIL |
Nicolette Womack
|
|
|
Ordinance readings for rezone must be completed, expected by end of January.
|
Routing - Design Review | 12/24/2019 | | 12/30/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 12/24/2019 | | 12/27/2019 | | PASS |
Andy J. Long
|
|
|
No ESC permit required.
|
Routing - MECHANICAL | 12/24/2019 | | 12/26/2019 | | PASS |
Chad Schwendiman
|
|
|
No Mechancial drawings required at this time.
|
Routing PW Sewer Design | 12/24/2019 | | 12/24/2019 | | PASS |
DeAnn Brown
|
|
|
Building already connected to sewer. No new fixtures.
|
Routing - Addressing | 12/24/2019 | | 12/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/24/2019 | | 12/24/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 12/24/2019 | | 12/24/2019 | | PASS |
Brian Murphy
|
|
|
less1000 square new
|
Intake Approval | | | 12/19/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/12/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
•The following item did not get addressed, Per checklist provide site specific fire flow at hydrants letter from Suez Water or other public water provider (since this is a single check box in the checklist this item is required)
• The following item did not get addressed, Per checklist provide and show location of the fire extinguishers and per the required locations of the 2015 IBC section 906.1
|
Intake Approval | | | 12/5/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per checklist provide site specific fire flow at hydrants letter from Suez Water or other public water provider
• Provide mechanical plans for the new repair garage or provide an email transcript from mechanical supervisor Chad Schwendiman stating no mechanical plans required.
• Per checklist provide and show location of the fire extinguishers.
|
Application received | | | 12/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 4 2019 11:19AM
|