Permit Information
Permit NumberBLD19-04745
StatusIssued
Name STROTH GENERAL
Site Address 100 N 8TH ST
Project NameStella's Ice Cream Shop
Customer Number 
ePlanReviewNo
Description
(STELLA’S ICE CREAM SHOP – 1ST STORY – SOUTHWEST CORNER) (3-9-20 PLAN MODIFICATION TO INSTALL A BELOW GRADE SUMP PUMP TO SERVE THE KITCHEN, A BELOW GRADE GREASE INTERCEPTOR IN THE KITCHEN, AND A GREASE INTERCEPTOR PUMP-OUT PORT THROUGH THE EXTERIOR WALL AT MAIN STREET. THE SUMP PUMP COVER IS REQUIRED TO HAVE A MINIMUM LIVE LOAD CAPACITY OF AT LEAST 100 POUNDS PER SQUARE FOOT. ALL SURFACES AND ELEVATION CHANGES AT THE SUMP PUMP COVER ARE REQUIRED TO BE ACCESSIBLE TO THE DISABLED. IN ADDITION, A PORTION OF THE CEILING OUTSIDE OF THE KITCHEN WILL BE RAISED TO 12 FEET AND THE ELECTRICAL SERVICE TO THIS TENANT SPACE WILL BE UPGRADED.) The fire sprinkler system is used for high rise and for fire area. To remodel an existing 923 square foot tenant space located on the 1st story of an existing high rise building for a new food service tenant. Egress is directly to the outside at grade. Work is to include interior nonbearing walls, interior doors, millwork, food preparation equipment, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Approved signage is required to be posted within this tenant space with directions to the public toilet rooms located on the 1st story. The signage shall state that public toilet rooms are available and shall include the passcode. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/11/20208/11/20208/11/2020PCANC
DetailsJim Page
Life safety complete on 04JUNE2020, this request is cancelled.

Phone #: ###-#### Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
BLD-Final6/10/20206/11/20206/11/2020PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rick pew
FIRE-Final Inspection6/4/20206/4/20206/4/2020APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher will be placed in discussed location and has a current inspection tag. Final life fire safety inspection for area of work is complete, signatures provided on permit sign off card.
BLD-Ceiling Grid Inspection6/1/20206/2/20206/2/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rick pew
Zoning Approval6/1/20206/1/20206/1/2020 PASS
DetailsKatelyn Menuge
BLD-Framing/Rough-in4/26/20204/27/20204/27/2020PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rick pew
Plan assigned to (CJW)2/20/20202/20/20203/9/2020 PASS
DetailsCarl Westfall
plan mod (Stella's Ice Cream Shop) (paper) (routed to staff)
Plan Reviewer's activity  3/9/2020 PASS
Plan mod review approved
Permit Ready to Issue  3/9/2020 DONE
PLAN MOD
Need
Cert of Value for plan mod
Telephone call  3/9/2020 DONE
Spoke with Maria informing her the plan mod is ready and the fee amount due
CHANGE STATUS TO (ISS)  3/9/2020 DONE
Routing - PLUMBING3/6/2020 3/6/2020 PASS
DetailsDan Ediger
Per plans and ISPC. 2" pumps approved for effulent drains.
Routing - PLAN CHECK3/5/2020 3/6/2020 PASS
DetailsCarl Westfall
Since it is located in a walking surface, the sump lid must comply as a walking surface that is accessible to the disabled. The grease trap and sump pump were provided within this tenant space because routing to the building grease trap, as previsously proposed, was undesirable to the tenant. CJW
Routing - Design Review3/5/2020 3/5/2020 PASS
DetailsKatelyn Menuge
Will submit a written plan to planning for grease removal at exterior port prior to occupancy.
Plan Modification Accepted  3/5/2020 DONE
representative from Cushing Terrell dropped of plumbing plans. 2 copies of sheets: P001 and P101
Plan resubmittals received  3/5/2020 DONE
Routing - Design Review3/4/2020 3/4/2020 FAIL
DetailsKatelyn Menuge
Emailed architect and owner to ask for additional information.
Routing - PLUMBING3/4/2020 3/4/2020 FAIL
DetailsDan Ediger
See correction on plan mod review paper plan. Sizing and Backflow issues
Plan resubmittals requested  3/4/2020 DONE
Routing - PUBLIC WORKS2/25/2020 2/26/2020 PASS
DetailsCandy A. Nichols
PLAN MOD-NO NEW PLUMBING
Routing PW Solid Waste2/25/2020 2/26/2020 PASS
DetailsEvan Carpenter
PLAN MOD
Routing PW Environmental2/25/2020 2/25/2020 PASS
DetailsZach Conde
Approved with grease abatement as shown.
Routing - PLAN CHECK2/20/2020 2/25/2020 PASS
DetailsCarl Westfall
Plan modification approved and started routing
Plan Modification Accepted  2/20/2020 DONE
Plan Mod for plumbing, Electrical, and architectural

Sheets: A101, A801, P001, P101, E100
FIRE-Conference2/6/20202/7/20202/7/2020ADONE
DetailsJim Page
Fire conference is complete, fire alarm modifications will be required for area of work. A seperate FIR permit is required for any and all modifications to a fire alarm system to include minor relocations of fire alarm associated devices.

Phone #: ###-#### Inspection requested via web by rick pew
Issue PAID IN FULL permit  1/13/2020 DONE
Print Occupancy Form  1/13/2020 DONE
Telephone call  1/10/2020 DONE
left a message for maria informing permit is ready, need 302 & 306 form. also informing once fees are paid the GC will need to come in and sign for the permit
Plan assigned to (CJW)12/12/201912/25/20191/9/2020 PASS
DetailsCarl Westfall
(1st done) 12/20/19 (L-2 - 7 days) (paper - 14 sheets) Stellas (routed resubmittal)
Routing - PLAN CHECK1/6/2020 1/9/2020 PASS
DetailsCarl Westfall
Routing - Design Review1/9/2020 1/9/2020 PASS
DetailsKatelyn Menuge
Window film approved to be frosted/translucent white.
PLANS/APPL TAKEN TO FRONT DESK  1/9/2020 DONE
Print Occupancy Form  1/9/2020 DONE
Permit Ready to Issue  1/9/2020 DONE
all met Need
GC Form
Revised cert of value
Route to Impact Fee Review1/3/20201/6/20201/6/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Plan resubmittals received  1/6/2020 DONE
Two copies each of G101 Wall assemblies, A101 enlarged floor plan, M101 HVAC plans, E100 electrical plans and E200 electrical specifications stamped and taken to plan reviewer.
Routing - FIRE12/12/201912/12/20191/3/2020 PASS
DetailsJoe Bruce
Attached fire code review to paper plans.
1st review completed  1/3/2020 FAIL
DetailsCarl Westfall
Failed DR and Plan Check. Resubmittal required.
Routing - PLAN CHECK12/17/2019 12/30/2019 FAIL
DetailsCarl Westfall
Routing - PLUMBING12/30/2019 12/30/2019 PASS
DetailsDan Ediger
Per plans and ISPC
Routing - Design Review12/26/2019 12/30/2019 FAIL
DetailsJosh Wilson
Black out film on windows requires Design Review approval. Applicant contacted.
Routing - MECHANICAL  12/30/2019 PASS
Plan Reviewer's activity  12/26/2019  
This project should be classified as a 520 major tenant improvement because of the agencies that need to review it, because it is a change of occupancy and use, and because of its valuation.
Routing - PUBLIC WORKS12/12/2019 12/17/2019 PASS
DetailsMorgan Webb
Routing - Addressing12/12/2019 12/17/2019 PASS
Routing PW Environmental12/16/2019 12/17/2019 PASS
Plans ACCEPTED BY PLAN TECH  12/12/2019 DONE
Recd Pcfee & Taken To Pln CK  12/12/2019 DONE
Intake Approval  12/12/2019 PASS
DetailsMichael Hanson
Application received 12/4/2019