Plan Reviewer's activity | | | 4/13/2020 | | DONE |
Carl D Madsen
|
|
|
Change this permit from Vanilla to occupancy OK for Hand In Hand LLC.
|
BLD-Final | 4/9/2020 | 4/10/2020 | 4/10/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Zollinger. Ok for perm occ.
|
FIRE-Final Inspection | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor is removing the non-functional door mag at main exit.
Phone #: ###-#### Inspection requested via web by Brad Zollinger
|
FIRE-Final Inspection | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | FAIL |
Jim Page
|
|
|
Project is not ready for life fire safety inspection, fire sprinkler heads are covered with paint masking, exit light are masked for painting, test switch under masking, inspection request will need to be resheduled. Will need to verify mag-lock release on main entry doors during active fire alarm per 2015 IFC section 1010.1.9.8.
Phone #: ###-#### Inspection requested via web by Brad Zollinger
|
BLD-Framing/Rough-in | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Brandon Shaw
|
|
|
I will be there to let you in another door. Phone #: ###-#### Inspection requested via web by Brad Zollinger
|
BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | NR |
Mike Jordan
|
|
|
Door will be open on east side of building. Please call if questions. Phone #: ###-#### Inspection requested via web by Brad Zollinger
|
CHANGE STATUS TO (ISS) | | | 3/16/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/13/2020 | | DONE |
|
|
|
Plan mod approved
|
Plan assigned to (JG) | 3/11/2020 | 3/11/2020 | 3/12/2020 | | PASS |
Jason C. Taylor
|
|
|
plan mod: The project involves moving part of the newly construction demising wall and door in order to exclude an existing office from the
vanilla tenant area. Also, demolition and installation of an office door to accommodate the relocation of the demising wall.
Sheets A2.0 and A2.1
|
Routing - PLAN CHECK | 3/12/2020 | | 3/12/2020 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 3/11/2020 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | DONE |
Mike Jordan
|
|
|
ben Phone #: ###-####. will be ok for final after fire/life/safety has finaled.
|
FIRE-Final Inspection | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the fire sprinkler permit has been inspected/finaled.
Ben Phone #: ###-####
|
BLD-Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | NR |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm panel needs to be cleaned up, fire sprinkler permit needed for modifications, new door hardware to be single action type, repair exit signs and emergency lights.
Ben Phone #: ###-####
|
Telephone call | | | 12/20/2019 | | DONE |
|
|
|
emailed Mysti to let her know that the fees were assessed incorrectly. Told her she will need a refund on BLD19-04769
|
Issue PAID IN FULL permit | | | 12/20/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 12/18/2019 | 12/21/2019 | 12/19/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 12/19/2019 | | DONE |
|
|
|
met: Need GC and Cert of value split for BLD19-04769 & BLD19-04869
|
Plan assigned to (JG) | 12/17/2019 | 12/17/2019 | 12/18/2019 | | PASS |
Javier Guzman
|
|
|
12/19 L1 Vanilla ePlan under BLD19-04769
|
Routing - Design Review | 12/17/2019 | | 12/18/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00454. Landscaping to fully screen A/C units.
|
Routing - PLAN CHECK | 12/17/2019 | | 12/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 12/17/2019 | | 12/18/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
1st review completed | | | 12/18/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2019 | | DONE |
|
|
|
|
Routing - Addressing | 12/17/2019 | | 12/17/2019 | | PASS |
Doug Chausow
|
|
|
Suite 100
|
Intake Approval | | | 12/17/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | 12/17/2019 | | | |
|
|
|
|
Application received | | 12/17/2019 | | | |
|
|
|
|