Permit Information
Permit NumberBLD19-04915
StatusIssued
Name SCOTT HEDRICK CONSTRUCTION
Site Address 3201 W AIRPORT WAY
Project NameAirport - Boarding Bridge C8A
Customer Number 
ePlanReviewYes
Description
(BOISE AIRPORT - BOARDING BRIDGE C8A) ***PLAN MOD UPDATING THE STRUCTURAL ONLY DUE TO ACTUAL ONSITE CONDITIONS*** The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction of the concourse building. Certificate of completion to be issued upon final inspection approval. Permit to construct a fixed 100 foot long elevated passenger boarding bridge to connect Concourse C to the fixed end of a passenger boarding bridge at Gate C8A (which has the capacity telescope and rotate about the fixed end). Work to include: interior ramp, exterior footings and installation of a pre-manufactured passenger boarding bridge, electrical work, and plumbing work. Approval is contingent on adhering to the approved plans, notations, local codes and ordinanaces. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/6/20208/7/20208/7/2020PPASS
DetailsJim Storey
Requesting PM inspection for framing. Please call 30 minutes prior to meet at gate 50 to be escorted. Thanks!

Frank Phone #: ###-#### Inspection requested via web by Frank Loucks exterior wall ok
BLD-Concrete7/29/20207/30/20207/30/2020APART
DetailsJim Storey
Requesting inspection for a concrete/rebar ramp at Gate C8A for a 11:00AM concrete pour. Call 30 minutes prior to be escorted to job site
MTI will be on site to witness the epoxy of smooth dowels and rebar.
Thanks! Phone #: ###-#### Inspection requested via web by Frank Loucks // si on site pending report.
BLD-Foundation7/8/20207/8/20207/8/2020PPASS
DetailsJim Storey
Requesting to call 30 min prior to meet at gate 50 to be escorted in SIDA badge area. Thanks! Phone #: ###-#### Inspection requested via web by Frank Loucks pending si report
BLD-Foundation7/1/20207/1/20207/1/2020PPEND
DetailsDave Hannah
Please call before coming so I can meet you at gate 50 to be escorted into the job site. If you don''t know where gat 50 is, call me so I can you give directions Thanks! Phone #: ###-#### Inspection requested via web by Frank Loucks ok after spec inspection sign off
Telephone call  7/1/2020 DONE
Let him know of the new COV and new fees.
CHANGE STATUS TO (ISS)  7/1/2020 DONE
OVERRIDE  6/23/2020  
Permit Ready to Issue  6/23/2020 DONE
MET NEW REVISED VALUE FOR MOD
PLAN MOD
Plan assigned to (M_H)5/22/2020 6/22/2020 DONE
DetailsMichael Hanson
06/02 Plan Mod - Airport bridge - Structural update
Routing - PLAN CHECK5/28/2020 6/22/2020 PASS
DetailsMichael Hanson
Routing Off Site - STRUCTURAL5/28/2020 6/22/2020 PASS
DetailsMichael Hanson
AHJ
PLANS/APPL TAKEN TO FRONT DESK  6/22/2020 DONE
DetailsMichael Hanson
Route to Impact Fee Review5/22/20205/25/20205/27/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan Modification Accepted  5/22/2020 DONE
DetailsChristina Prado
Relocate fixed walkway - Will need new COV
Issue & PRINT permit  3/9/2020 DONE
Inspection Record Card- Bld  3/9/2020 DONE
OVERRIDE  3/2/2020  
Permit Ready to Issue  3/2/2020 DONE
ALL MET
Need
GC Form
Revised Cert of Value
(if city of boise is paying for fees, please have them email the JV account)
Plan assigned to (M_H)1/10/2020 3/2/2020 DONE
DetailsMichael Hanson
1st review completed - 02/10 #502 L3 ePlan - Airport Walkway Gate C8A
Routing Off Site - STRUCTURAL2/24/2020 3/2/2020 PASS
DetailsMichael Hanson
AHJ
1st review completed  2/10/2020 DONE
DetailsMichael Hanson
Routing Off Site - STRUCTURAL1/10/2020 2/10/2020 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required by AHJ engineering.
Routing - PLAN CHECK1/10/2020 2/10/2020 PASS
DetailsMichael Hanson
Routing - FIRE1/10/20201/10/20202/3/2020 PASS
DetailsErika Akin
No comments attached. PDS Fire to verify life safety.
Routing - PLANNING1/10/2020 1/15/2020 PASS
DetailsNicolette Womack
Exterior changes as per Design Review approval.
Routing - PLUMBING1/10/2020 1/14/2020 PASS
DetailsDaryl Spivey
No plumbing review required
Routing PW Drainage1/10/2020 1/10/2020 PASS
DetailsBrian Murphy
Routing - Addressing1/10/2020 1/10/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/10/2020 1/10/2020 PASS
DetailsMorgan Webb
NO NEW PLUMBING FIXTURES.
Routing - Erosion and Sediment1/10/2020 1/10/2020 PASS
DetailsMichael Zawacki
Waiver approved
Routing - Design Review1/10/2020 1/10/2020 PASS
DetailsKatelyn Menuge
Intake Approval  12/31/2019 PASS
DetailsJavier Guzman
Intake Approval  12/27/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• On the uploaded 310 form provide owners or design professionals signature and date
• Provide DR/Planning & Zoning letters of approval for the exterior work.
Application received  12/20/2019 DONE
Application submitted via PDS Online on Dec 20 2019 3:37PM