Second Notice | | 7/18/2020 | 8/10/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
First Notice | | 6/5/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Permanent Occupancy | | | 5/26/2020 | | DONE |
|
|
|
|
BLD-Final | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PASS |
Tell Riley
|
|
|
*screened* Todd Phone #: ###-####//Electrical passed//breakroom and restrooms all existing//phase one of project was inspected for framing etc, phase two was covered with ni inspection, trades passed, appears to meet plans//fire life safety red lines had been completed at final building inspection// appears to meet city approved plans//final complete//
|
BLD-Final | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PART |
Tell Riley
|
|
|
screened // Todd Phone #: ###-####//need to get electrical permit finaled that is open//did walk through, corrections made for Fire Life Safety as redlined//2nd phase was not inspected for framing, appears to be per plans//will need to come back after ele is final//
|
FIRE-Final Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to remove the exit sign as previously discussed or provide correct single action hardware at the Exam Room door prior to a building inspection. Screened-Todd Phone #: ###-####
|
FIRE-Final Inspection | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | FAIL |
Troy Cobbley
|
|
|
Repair and test exit signs/emergency lights, add exit sign as per plans, remove exit sign from the south west exam room door, the door swing does not match plan near restrooms, the partial wall in the exam room may not provide exit clearance to the exterior door, the installed wall does not match the plans at the exam room.Todd Phone #: ###-####
|
BLD-Energy code compliance | 2/26/2020 | 2/28/2020 | 2/28/2020 | A | PART |
Tell Riley
|
|
|
Todd Phone #: ###-####//fix insulation as noted on floor in red//ok to cover when fixed//
|
BLD-Framing/Rough-in | 2/26/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Tell Riley
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | NR |
Tell Riley
|
|
|
Todd Phone #: ###-####//need to complete air seal of penetrations//re-insulate exterior walls//verify service counter areas will be A117.1 compliant//re-inspection required//
|
Issue PAID IN FULL permit | | | 1/29/2020 | | DONE |
|
|
|
emailed todd@amyxhomes.com permit to sign
|
Print Occupancy Form | | | 1/29/2020 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/7/2020 | 1/7/2020 | 1/9/2020 | | PASS |
Javier Guzman
|
|
|
01/09 L1 Highland Chiropractic ePlan
|
Routing - PLAN CHECK | 1/7/2020 | | 1/9/2020 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 1/9/2020 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/9/2020 | | DONE |
|
|
|
ALL MET
NEED
GC FORM
REVISED VALUE
|
Routing - Addressing | 1/7/2020 | | 1/8/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/7/2020 | | 1/8/2020 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/3/2020 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 1/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 2 2020 10:35AM
|
Intake Approval | | | 1/2/2020 | | FAIL |
Jenny Nelson
|
|
|
Please provide door hardware schedule for new and existing doors.
|
Third Notice | | 8/15/2020 | | | |
|
|
|
|