Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD20-00066
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 300 E MALLARD DR Unit: STE 125
Project NameVanilla - Suite 125
Customer Number 
ePlanReviewYes
Description
(VANILLA – SUITE #125) NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit to remodel an existing 761 sq. ft. space and expand into 428 sq. ft. portion of the existing adjacent space to create a new vacant tenant space that is 1,189 sq. ft. within the 1st floor of the existing building. This permit is approved contingent upon adhering to the approved plans on file. Work includes: removal of select interior nonbearing wall, removal of select door/door frame, select new wall infill, construction of interior non-bearing tenant demising wall, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully fire sprinklered for one-hour substitution. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/27/20202/27/20202/27/2020PPASS
DetailsBrandon Shaw
please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
DOC - Permit Finaled2/27/20202/27/20202/27/2020PPASS
DetailsBrandon Shaw
FIRE-Final Inspection2/24/20202/27/20202/27/2020APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.

Phone #: ###-#### Inspection requested via web by Chase Cheverton
Letter of compliance/Occupancy  2/27/2020 DONE
BLD-Framing/Rough-in1/31/20202/3/20202/3/2020PPASS
DetailsBrandon Shaw
Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
Issue PAID IN FULL permit  1/14/2020 DONE
Inspection Record Card- Bld  1/14/2020 DONE
Plan assigned to (JG)1/10/20201/10/20201/13/2020 PASS
DetailsJavier Guzman
01/15 L1 Vanilla Suite #125 ePlan
Routing - PLAN CHECK1/10/2020 1/13/2020 PASS
DetailsJavier Guzman
1st review completed  1/13/2020 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/13/2020 DONE
Permit Ready to Issue  1/13/2020 DONE
ALL MET
Need
GC Form
Revised Cert of Value
Routing - Addressing1/10/2020 1/10/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/10/2020 1/10/2020 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Routing PW Flood Plain1/10/2020 1/10/2020 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance .No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Intake Approval  1/9/2020 PASS
DetailsJavier Guzman
Application received  1/7/2020 DONE
Application submitted via PDS Online on Jan 7 2020 2:49PM