Permit Information
Permit NumberBLD20-00111
StatusIssued
Name HILL CONSTRUCTION CO
Site Address 6520 W STATE ST
Project NameLes Schwab 103 - State Street
Customer Number 
ePlanReviewYes
Description
(LES SCHWAB TIRES) Certificate of completion to be issued upon final inspection approval. Permit to remodel of an existing 6,390 sqft. tire service center. Demo work to include: select load-bearing walls, select non-bearing walls, fixtures, exterior window, fencing, gates, doors, millwork, electrical, plumbing, and mechanical. New work to include: exterior wall infill, (4) exterior roll-up doors, (1) exterior man door, (1) exterior main entry double doors, (5) new exterior windows, exterior walls, exterior roof, interior nonbearing walls, interior doors, fixtures, (2) accessible bathrooms, millwork, mechanical work, plumbing work, electrical work, and interior finishes. Modify exterior bullpen to allow for egresss to public way. Approval is contingent to adhering to approved plans, notations, engineering, local codes and ordinances. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is equiped with a fire alarm system. Racking exceeding 8'-0" requires a separate racking permit. Structural engineering has been provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  8/6/2020 DONE
OVERRIDE  7/31/2020  
FIRE-Conference7/30/20207/31/20207/31/2020ADONE
DetailsJim Page
Fire conference complete.

Miles */Screened*/ Phone #: ###-####
PLANS/APPL TAKEN TO FRONT DESK  7/31/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/31/2020 DONE
plan mod approved
Routing - PLAN CHECK7/30/2020 7/31/2020 PASS
DetailsMichael Hanson
Routing - FIRE7/30/20207/30/20207/30/2020 PASS
DetailsJoe Bruce
Plan mod reviewed for phased occupancy. Fire inspector to field verify life safety and fire alarm for portion of occupied building.
Telephone call  7/23/2020 DONE
Per Todd Poirer, main contact for ePlan should be switched to Cory Nelson Architect with Cushing Terrell. Todd will be moving to a different company.
Plan Modification Accepted  7/17/2020 DONE
Request for phased TOC, owner is currently open during remodel and equipment is needing to be relocated for next phase of construction to begin. Requesting temporary use of phase 1 service bays to be used for changing tires while remaning portion of buiding (phase 2) is completed.
Plan assigned to (M_H)7/17/2020 7/17/2020 DONE
DetailsMichael Hanson
plan mod
FIRE-Conference7/15/20207/16/20207/16/2020ADONE
DetailsJim Page
Fire conference is complete. A formal request for phased TCO plan will need to be submitted to the building code official as well as the fire code official for approval. All fire life safety items, too include fire alarm install and operation, will be required for the phased areas.

John- */Screened*/ Phone #: ###-####
BLD-Conference7/13/20207/14/20207/14/2020APEND
DetailsTony Young
need the talk to Tony about opening a room Phone #: ###-#### Inspection requested via web by Miles Hash// needs trades approval before consideration
BLD-Framing/Rough-in6/5/20206/8/20206/8/2020APASS
DetailsTony Young
Miles *screened* Phone #: ###-####// interior walls ok
Override - Parcel Holds6/5/20201/1/19006/5/2020  
.
BLD-Other5/15/20205/18/20205/18/2020APEND
DetailsTony Young
8:30 groute // Miles Phone #: ###-####// pending special inspection report
BLD-Footing5/5/20205/6/20205/6/2020PPEND
DetailsTony Young
Miles - 3 o clock pour Phone #: ###-####// pending special inspection report
Override - Parcel Holds5/5/20201/1/19005/5/2020  
override
Override - Parcel Holds  3/19/2020  
Issue PAID IN FULL permit  3/19/2020 DONE
Inspection Record Card- Bld  3/19/2020 DONE
OVERRIDE  3/16/2020  
Plan assigned to (M_H)2/13/2020 3/16/2020 DONE
DetailsMichael Hanson
03/17 - 3rd Rev - #520 L3 eplan - Les Schwab Tire Remodel
Routing Off Site - STRUCTURAL3/10/2020 3/16/2020 PASS
DetailsJulie Romig
AHJ 3rd Review
PLANS/APPL TAKEN TO FRONT DESK  3/16/2020 DONE
Override - Parcel Holds  3/16/2020  
Permit Ready to Issue  3/16/2020 DONE
MET GREG@HILL-CC.COM
NEED
GC
REV VALUES
RP
'Per Daren Fluke, Ok to Issue and override Parcel Tag. Leave Parcel Tag on as there are ACHD improvements in the area."
Routing Off Site - STRUCTURAL3/2/2020 3/6/2020 FAIL
DetailsMichael Hanson
AHJ engineering
Routing PW Drainage3/2/2020 3/4/2020 PASS
DetailsBrian Murphy
Routing - PLAN CHECK3/2/2020 3/2/2020 PASS
DetailsMichael Hanson
Route to Impact Fee Review2/21/20202/24/20202/21/2020 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  2/21/2020 FAIL
DetailsMichael Hanson
Routing - PLAN CHECK1/24/2020 2/21/2020 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing Off Site - STRUCTURAL1/24/2020 2/21/2020 FAIL
DetailsMichael Hanson
AHJ
Routing - FIRE1/24/20201/24/20202/20/2020 PASS
DetailsGreg Ruxton
Comments attached to case.
Plan assigned to (JAR)1/24/20201/24/20202/13/2020 DEFR
DetailsJulie Romig
02/19 - L3 Les Schwab Tire Remodel
Routing - MECHANICAL1/24/2020 2/3/2020 PASS
DetailsTroy James
Routing - Design Review1/24/2020 1/31/2020 PASS
DetailsMichaella Owens
Routing - PLUMBING1/24/2020 1/30/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing PW Sewer Design1/27/2020 1/28/2020 PASS
DetailsDeAnn Brown
Routing PW Environmental1/27/2020 1/28/2020 PASS
DetailsRick Christenson
Approved with the oil/sediment interceptor as shown
Routing PW Solid Waste1/27/2020 1/27/2020 PASS
DetailsEvan Carpenter
Approved for single-dumpster enclosure.
Routing - Erosion and Sediment1/24/2020 1/27/2020 PASS
DetailsMichael Zawacki
Waiver approved
Routing PW Drainage1/27/2020 1/27/2020 FAIL
DetailsBrian Murphy
need apendx j o and m hydrocarbon tretment system
Routing PW Street Lights1/27/2020 1/27/2020 PASS
DetailsTom Marshall
Routing - Addressing1/24/2020 1/27/2020 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/24/2020 1/27/2020 PASS
DetailsMorgan Webb
CREDIT FOR DEMO. NO NEW FEES.
Plan Reviewer's activity  1/23/2020 DONE
DetailsBrian McGowan
Sheet C001 was not stamped, dated and signed but I did not want to send the Prescreen back for a single sheet.
Intake Approval  1/23/2020 PASS
DetailsBrian McGowan
Prescreen approved by BJM
Intake Approval  1/17/2020 FAIL
DetailsBrian McGowan
Please address or provide the following for your Prescreen to be approved;
1. No Drainage Systems Operation and Maintenance Plan were uploaded.
2. The "C" drawings do not provide the required area for the City of Boise Approval stamp.
3. LS103 is a complete set of the drawings in a single file. I will need to delete this for your submittal.
Application received  1/13/2020 DONE
Application submitted via PDS Online on Jan 13 2020 3:52PM