Second Notice | | 5/17/2020 | 5/14/2020 | | DONE |
|
|
|
This permit finaled on the web by Michele Rodgers
|
First Notice | 5/5/2020 | 5/5/2020 | 5/7/2020 | | DONE |
Brandon Shaw
|
|
|
mailed 5-8-2020
|
BLD-Final | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Brandon Shaw
|
|
|
Please call ahead ###-####
thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
DOC - Permit Finaled | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. if you have any questions you can call me at ###-####
thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
BLD-Final | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | NR |
Tell Riley
|
|
|
if you could please give me a call 30min ahead of the inspection
Thanks Mike Teeter ###-#### Phone #: ###-#### Inspection requested via web by Mike Teeter//need to schedule fire life safet for sign off and reschedule for building final//
|
Route to Impact Fee Review | 1/31/2020 | 2/3/2020 | 2/3/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Telephone call | | | 2/3/2020 | | DONE |
|
|
|
will need to pay the sewer trunk fees before permit can be issued
|
Issue PAID IN FULL permit | | | 2/3/2020 | | DONE |
|
|
|
|
1st review completed | | | 1/31/2020 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/31/2020 | | DONE |
|
|
|
Need: GC, Adjusted Cert of Value
|
Plan assigned to (M_H) | 1/23/2020 | | 1/31/2020 | | DONE |
Michael Hanson
|
|
|
01/27 #518 L1 ePlan - Albertsons
|
Routing - MECHANICAL | 1/23/2020 | | 1/31/2020 | | PASS |
Troy James
|
|
|
new condensing unit on roof top for new walk in coolers and freezers.
|
Routing - PLUMBING | 1/23/2020 | | 1/30/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLAN CHECK | 1/23/2020 | | 1/27/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Environmental | 1/24/2020 | | 1/27/2020 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 1/23/2020 | 1/23/2020 | 1/24/2020 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
|
Routing - PUBLIC WORKS | 1/23/2020 | | 1/24/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 1/23/2020 | | 1/24/2020 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 1/21/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/17/2020 | | FAIL |
Julie Romig
|
|
|
The refrigeration drawings, R1.1-R5.1 have a 2016 CTA titleblock but are not stamped/signed by CTA. Please provide stamped/signed drawings from CTA with a current date if they are acting as consultant, provide a letter from CTA allowing use/alteration of their drawings, or provide drawings from CSHQA instead.
If these drawings are not necessary for permit (ie all code requirements are addressed on other architectural, plumbing, mechanical sheets), please identify which sheets need to be deleted from ePlanReview.
|
Application received | | | 1/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2020 9:56AM
|