Permit Information
Permit NumberBLD20-00152
StatusFinaled
Name CBH HOMES
Site Address 10044 W CAMPVILLE ST
Project NameLOT 29 BLK 01 UNION SQUARE SUB
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2054 sq. ft., two story (first story 929 sq. ft., second story 1125 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 89 sq. ft. of covered patio/porch and a 703 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-2D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/13/20205/14/20205/14/2020APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled5/14/20205/14/20205/14/2020PPASS
DetailsMike Jordan
BLD-Blower Door Test Results5/14/20205/14/20205/14/2020ADONE
DetailsMike Jordan
4.2
BLD-Final5/12/20205/12/20205/12/2020PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs electrical final.
Fees Due Hold4/14/2020 4/16/2020 DONE
Details
BLD-Energy code compliance3/30/20203/30/20203/30/2020PPASS
DetailsMike Jordan
This is the house that we have had some Sheetrock hung at Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in3/30/20203/30/20203/30/2020PPASS
DetailsMike Jordan
This is the house that we have had some Sheetrock hung at Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Energy code compliance3/27/20203/30/20203/30/2020ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Framing/Rough-in3/27/20203/30/20203/30/2020ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Energy code compliance3/26/20203/27/20203/27/2020PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020PNR
DetailsMike Jordan
Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in3/26/20203/26/20203/26/2020AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Roll block floor joist at all interior bearing locations. Draft stop floor joist to divide area to less than 1,00s.f. Ok to insulate. Correction notice posted.
BLD-Framing/Rough-in3/17/20203/23/20203/23/2020ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. rough in inspection.
Routing - MECHANICAL3/23/2020 3/23/2020 PASS
DetailsTroy James
Resubmitted ACCA report
Plan Modification Accepted  3/20/2020 DONE
Gloria from CBH homes opening up permit for Man J resubmissions
BLD-Wall Bracing3/9/20203/12/20203/12/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
Plan Modification Accepted  3/3/2020 DONE
Plan Mod Manual J per CBH Homes Gloria Martinez
BLD-Foundation2/20/20202/21/20202/21/2020PPASS
DetailsMike Jordan
Jerry Phone #: ###-####
BLD-Footing2/19/20202/20/20202/20/2020PPASS
DetailsMike Jordan
Dane Phone #: 28-###-####
Issue PAID IN FULL permit  2/5/2020 DONE
Inspection Record Card- Bld  2/5/2020 DONE
OVERRIDE  2/4/2020  
Plan assigned to (RDP)1/27/20201/27/20202/4/2020 DONE
DetailsRob Patrick
02/07 sfd L1 ePlan
Routing - PLAN CHECK1/27/2020 2/4/2020 PASS
DetailsRob Patrick
1st review completed  2/4/2020 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/4/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  2/4/2020 DONE
Route to Impact Fee Review1/27/20201/30/20201/28/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - PLANNING1/27/2020 1/28/2020 PASS
DetailsSue Cummings
Routing - Addressing1/27/2020 1/27/2020 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/27/2020 1/27/2020 PASS
DetailsCandy A. Nichols
Routing - MECHANICAL1/27/2020 1/27/2020 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  1/27/2020 DONE
Recd Pcfee & Taken To Pln CK  1/27/2020 DONE
Intake Approval  1/27/2020 PASS
Application received  1/16/2020 DONE
Application submitted via PDS Online on Jan 16 2020 3:26PM