Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD20-00298
StatusFinaled
Name Jacob Thompson
Site Address 5771 N DISCOVERY WAY
Project NameHeroes Academy
Customer Number 
ePlanReviewYes
Description
(HEROES ACADEMY) **Permit for a change of occupancy for a 7,627 sq ft existing office suite to a new educational tenant, Heroes Academy. No work is being done in the space. Verify completion of all existing conditions in compliance with code requirements for the new E occupancy, including panic hardware on all exterior doors, emergency egress lighting on backup, exit signs, etc. There is an Occupant Load Reduction limiting the total occupant load to 100. If occupant load exceeds 100, an emergency voice/alarm communication system is required. This building is fully fire sprinklered with an NFPA 13 system for area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  5/8/2020 DONE
Permanent Occupancy  5/8/2020 DONE
BLD-Final5/4/20205/6/20205/6/2020PPASS
DetailsTell Riley
Jake Phone #: ###-####//documents for code alternate approved, fire life safety passed, final complete//
FIRE-Final Inspection5/4/20205/5/20205/5/2020PPASS
DetailsTroy Cobbley
Life safety passed. See load reduction approved by the building and fire dept.



Jake Phone #: ###-####
FIRE-Final Inspection5/4/20205/5/20205/4/2020PCANC
DetailsTroy Cobbley
Jake Phone #: ###-####
Temporary Occupancy4/20/20207/19/20204/20/2020 DONE
DetailsGabe Brenner
Reprint with 100 Occ Load
Print Occupancy Form  4/20/2020 DONE
Reprint Occ Form with new Occ Load
Plan Reviewer's activity  4/20/2020  
DetailsJulie Romig
Code Alternate Request approved by Building Official and Fire Marshal and uploaded into Tidemark and ePlanReview.
Temporary Occupancy3/31/20206/29/20203/31/2020 DONE
DetailsBrittany Hill
BLD-Final3/23/20203/24/20203/24/2020PPART
DetailsTell Riley
Jake Phone #: ###-####//no changes//temp ok until fire life safety has passed//ok per plan review report and plans//
FIRE-Final Inspection3/23/20203/24/20203/24/2020APART
DetailsTroy Cobbley
Life safety is ok for final with Jason and Joe's approval, for a temp. reduced class size, until the required voice evac system has been installed/tested.

Jake Phone #: ###-####
BLD-Conference3/18/20203/19/20203/19/2020ADONE
DetailsTell Riley
Jake Phone #: ###-####
Plan Reviewer's activity  3/19/2020 DONE
DetailsJoe Bruce
Uploaded letter into documents regarding a 90 Temp Occupancy for a reduced class size. **JHB**
FIRE-Final Inspection3/18/20203/18/20203/18/2020PFAIL
DetailsTroy Cobbley
Provide code compliant voice evac system as per fire code review note #3, provide exit discharge ligths as per fire code review.

jake Phone #: ###-####
BLD-Final3/17/20203/18/20203/18/2020ANR
DetailsTell Riley
Please Call in advance Jake Phone #: ###-####//let Jake know he needs fire life safety final prior to final building//
Plan assigned to (JAR)2/5/20202/5/20203/17/2020 DONE
DetailsJulie Romig
02/27 - L3 Heroes Academy
Routing - PLAN CHECK2/5/2020 3/17/2020 PASS
DetailsJulie Romig
1st review completed  3/17/2020 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  3/17/2020 DONE
Permit Ready to Issue  3/17/2020 DONE
MET
Issue PAID IN FULL permit  3/17/2020 DONE
Routing - FIRE2/5/20202/5/20203/12/2020 PASS
DetailsGreg Ruxton
Attached plan review report to case.
Routing - MECHANICAL3/4/2020 3/4/2020 PASS
DetailsTroy James
Uploaded mechanical ventilation design by mechanical engineer. The HVAC is required to be balanced to provide the required outside air.
Routing - MECHANICAL2/5/2020 2/11/2020 FAIL
DetailsTroy James
Emailed mechanical comment to applicant.
Routing - Addressing2/5/2020 2/7/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/5/2020 2/5/2020 PASS
DetailsCandy A. Nichols
NO NEW PLUMBING
Routing - PLANNING2/5/2020 2/5/2020 PASS
DetailsEthan Mansfield
Intake Approval  1/31/2020 PASS
Intake Approval  1/30/2020 FAIL
DetailsJulie Romig
Need: 1. Form 304 for the registered design professional and signed by owner.
https://www.cityofboise.org/media/9161/304-registered-design-professional_dec-2019_fillable.pdf
2. Two drawings have been uploaded - "A2.0_First Level Floor Plan" and "SP100_Site Plan", but both are the same sheet, G001. Both drawings have been deleted from the folder. Please upload the correct sheets. File name should match the actual sheet number ("G001_Cover and Plan).
3. Hardware schedule of all new and existing doors.
4. Exit signs and emergency lighting locations.
Application received  1/29/2020 DONE
Application submitted via PDS Online on Jan 29 2020 9:15AM