BLD-Final | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PART |
Mike Jordan
|
|
|
Kyle *screened* Phone #: ###-####. OK for temp occ. Needs to revise scope of work or submit aditional plans for occupancy. Provide final letter from special inspection agency and RFI from engineer for east footing.
|
Zoning Approval | 8/5/2020 | 8/5/2020 | 8/5/2020 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | NR |
Mike Jordan
|
|
|
Kyle */Screened*/ Phone #: ###-####
|
FIRE-Final Inspection | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PART |
Troy Cobbley
|
|
|
A temp for life safety is being given until the project related fire alarm permit is finaled.
Phone #: ###-####
|
BLD-Final | 7/31/2020 | 8/3/2020 | 8/3/2020 | P | NR |
Mike Jordan
|
|
|
screened // Kyle Phone #: ###-####. Needs fire/life/safety and zoning finals.
|
FIRE-Final Inspection | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related firer alarm and hood suppresion permits finaled. Need all small documents, need address, need the exit signs and emergency lights repaired, need verification the room/walls at the cooler/fire riser room is ok to delete.
screened // Kyle Phone #: ###-####
|
PubWorks Occupancy Approval | 7/31/2020 | 7/31/2020 | 7/31/2020 | | DONE |
Mike Sheppard
|
|
|
|
BLD-Ceiling Grid Inspection | 7/28/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Mike Jordan
|
|
|
SCREENED // Kyle Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | NR |
Mike Jordan
|
|
|
screened // Kyle Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Mike Jordan
|
|
|
support framing for overbuilds at parapets.
|
BLD-Framing/Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | PASS |
Mike Jordan
|
|
|
screened // Andrew Phone #: ###-####. Insualtion above freezer ok.
|
BLD-Framing/Rough-in | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PASS |
Mike Jordan
|
|
|
Andrew *screened** Phone #: ###-####
|
BLD-Framing/Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 | P | FAIL |
Mike Jordan
|
|
|
Kyle Phone #: ###-####. Needs to provide updated strucutural details for steel studs in lieu of LVL studs for exterior furouts. Need special inspection reports for concrete and epoxy to date. Also needs to provide fire conferance on exterior furouts. Called Kyle at above number and left message. do not cover furouts at this time.
|
BLD-Footing | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Mike Jordan
|
|
|
screened // Andrew Phone #: ###-####. . remainder of footings for bumpouts.
|
BLD-Footing | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | PART |
Mike Jordan
|
|
|
Screened- Andrew Phone #: ###-####. Footing for freezer slab and architectual bump outs ok. Need enginner of records approval for new footing at storefront.
|
Issue PAID IN FULL permit | | | 4/30/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2020 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/23/2020 | | DONE |
|
|
|
met: cooplivin@me.com
NEED
GC
REV VALUES
|
Plan assigned to (M_H) | 3/3/2020 | | 4/23/2020 | | DONE |
Michael Hanson
|
|
|
2nd review completed - 03/23 #520 L3 ePlan - Costa Vida
|
Routing - PLAN CHECK | 4/21/2020 | | 4/21/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing - Design Review | 4/21/2020 | | 4/21/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - FIRE | 4/21/2020 | 4/21/2020 | 4/20/2020 | | PASS |
Greg Ruxton
|
|
|
Attached comments to case.
|
Route to Impact Fee Review | 3/30/2020 | 4/2/2020 | 3/31/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/3/2020 | 3/3/2020 | 3/30/2020 | | FAIL |
Greg Ruxton
|
|
|
Attached comments to case and emailed architect. GR
|
Routing - PLAN CHECK | 3/3/2020 | | 3/30/2020 | | FAIL |
Michael Hanson
|
|
|
See building plan review report for corrections required.
|
1st review completed | | | 3/30/2020 | | FAIL |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 3/3/2020 | | 3/10/2020 | | PASS |
Troy James
|
|
|
|
Routing PW Solid Waste | 3/4/2020 | | 3/10/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 3/3/2020 | | 3/9/2020 | | PASS |
Karla Nelson
|
|
|
Ok per CUP19-00050 must comply with DRH19-00330 as well
|
Routing - Design Review | 3/3/2020 | | 3/6/2020 | | FAIL |
Katelyn Menuge
|
|
|
Elevations don't match DR approval, bicycle rack requirements, new construction needs to meet 20-foot setback along Entertainment Ave.
|
Routing - PLUMBING | 3/3/2020 | | 3/4/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 3/3/2020 | | 3/4/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR EXISTING FAST FOOD REST.-NO FEES
|
Routing PW Environmental | 3/4/2020 | | 3/4/2020 | | PASS |
Zach Conde
|
|
|
Approved with existing grease abatement.
|
Routing - Erosion and Sediment | 3/3/2020 | | 3/3/2020 | | PASS |
Michael Zawacki
|
|
|
TI, no environmental impact, esc not needed.
|
Routing - Addressing | 3/3/2020 | | 3/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Plan Reviewer's activity | | | 2/25/2020 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 2/25/2020 | | PASS |
|
|
|
|
Intake Approval | | | 2/4/2020 | | FAIL |
|
|
|
(2-4-20) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
|
Application received | | | 1/30/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 30 2020 10:56AM
|