Information based on query as of Monday, July 15, 2024.
Permit Information
Permit NumberBLD20-00380
StatusIssued
Name COMPLETE PROPERTY MANAGEMENT & INVE
Site Address 7800 W CRESTWOOD DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(7800 & 7822 W Crestwood) **ACHD INSPECTION IS REQUIRED** Permit for the construction of a new 2889 sq. ft. duplex. Unit 7800 is 1589 sq. ft. with 3 bedrooms, 2 bathrooms, approximately 222 sq. ft. of covered patio/porch and 430 sq. ft. attached garage. Unit 7822 is 1330 sq. ft. with 3 bedrooms, 2 bathrooms, approximately 202 sq. ft. of covered patio/porch and 430 sq. ft. attached garage. All work per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance6/15/20206/16/20206/16/2020APASS
DetailsTell Riley
screened // Randy Phone #: ###-####//plans show r 49 insulation, let builder know to post on certification for final//
BLD-Framing/Rough-in6/12/20206/15/20206/15/2020PCANC
DetailsTell Riley
BLD-Framing/Rough-in6/12/20206/12/20206/12/2020PPASS
DetailsTell Riley
Screened- Randy Phone #: ###-####//add straps at portals// nail hangers, add overbuild bracing//ok to insulate//make sure tub gets insulation behind it//
BLD-Framing/Rough-in6/11/20206/11/20206/12/2020PCANC
DetailsTell Riley
Randy Phone #: ###-####
BLD-Wall Bracing5/12/20205/13/20205/13/2020APASS
DetailsTell Riley
Screened-Randy Phone #: ###-####//corrections made//add nails at 3" oc at portal//
BLD-Other5/7/20205/7/20205/7/2020PPART
DetailsTell Riley
Screened- sheeting inspection Randy Phone #: ###-####//add Hot Dip nails to PT plate//add nails at shear panels per plans//add PFH at walls on garage//other areas ok//
BLD-Wall Bracing4/8/20204/8/20204/8/2020PPART
DetailsTell Riley
Randy **left voicemail** Phone #: ###-####//interior separation walls ok, two areas are gb braced wall panels ok per plans//
BLD-Foundation3/20/20203/23/20203/23/2020APART
DetailsTell Riley
Randy Phone #: ###-####//WIP//
BLD-Footing3/18/20203/19/20203/19/2020APART
DetailsTell Riley
Randy Phone #: ###-####/setbacks per plans//ACHD inspection discussed with plan review, was told not to worry with the permit being residential//
BLD-Footing3/17/20203/18/20203/18/2020ANR
DetailsTell Riley
randy Phone #: ###-####//no plans onsite//no one onsite// still need to finish rebar and elevate//water standing in some areas of footings//
Inspection Record Card- Bld  3/10/2020 DONE
Reprint
Issue PAID IN FULL permit  3/2/2020 DONE
OVERRIDE  2/26/2020  
Plan assigned to (RDP)2/7/20202/7/20202/26/2020 DONE
DetailsRob Patrick
1st Review Complete: 02/19 Failed; Corrections Required...02/20 Duplex L2 PAPER
Inspection Record Card- Bld  2/26/2020 DONE
Telephone call  2/26/2020 DONE
Called Randy and let him know his permit was ready and what the fees are.
Routing - PLAN CHECK2/26/2020 2/26/2020 PASS
DetailsRob Patrick
Case Summary (BLD)  2/26/2020 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/26/2020 DONE
DetailsRob Patrick
Case Summary (BLD)  2/26/2020 DONE
Permit Ready to Issue  2/26/2020 DONE
Customer will need to contact West Boise for Sewer
Plan resubmittals received  2/24/2020 DONE
applicant dropped off resubmittal
1st review completed  2/19/2020 FAIL
DetailsRob Patrick
1st Review Complete: 02/19 Failed; Corrections Required
Routing - PLAN CHECK2/14/2020 2/19/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - MECHANICAL2/12/2020 2/14/2020 PASS
DetailsTroy James
Routing - PLANNING2/7/2020 2/12/2020 PASS
DetailsJeff Lowe
Route to Impact Fee Review2/7/20202/10/20202/10/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Addressing2/7/2020 2/7/2020 PASS
DetailsDoug Chausow
7800 W Crestwood Dr
7822 W Crestwood Dr
Routing - PUBLIC WORKS2/7/2020 2/7/2020 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT
Telephone call  2/7/2020 DONE
NO ACHD FEES SEE DOCUMENTS
Plans ACCEPTED BY PLAN TECH  2/7/2020 DONE
Intake Approval  2/7/2020 PASS
Recd Pcfee & Taken To Pln CK  2/7/2020 DONE
Application received 2/7/2020