BLD-Energy code compliance | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Tell Riley
|
|
|
screened // Randy Phone #: ###-####//plans show r 49 insulation, let builder know to post on certification for final//
|
BLD-Framing/Rough-in | 6/12/2020 | 6/15/2020 | 6/15/2020 | P | CANC |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | PASS |
Tell Riley
|
|
|
Screened- Randy Phone #: ###-####//add straps at portals// nail hangers, add overbuild bracing//ok to insulate//make sure tub gets insulation behind it//
|
BLD-Framing/Rough-in | 6/11/2020 | 6/11/2020 | 6/12/2020 | P | CANC |
Tell Riley
|
|
|
Randy Phone #: ###-####
|
BLD-Wall Bracing | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Tell Riley
|
|
|
Screened-Randy Phone #: ###-####//corrections made//add nails at 3" oc at portal//
|
BLD-Other | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PART |
Tell Riley
|
|
|
Screened- sheeting inspection Randy Phone #: ###-####//add Hot Dip nails to PT plate//add nails at shear panels per plans//add PFH at walls on garage//other areas ok//
|
BLD-Wall Bracing | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | PART |
Tell Riley
|
|
|
Randy **left voicemail** Phone #: ###-####//interior separation walls ok, two areas are gb braced wall panels ok per plans//
|
BLD-Foundation | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PART |
Tell Riley
|
|
|
Randy Phone #: ###-####//WIP//
|
BLD-Footing | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PART |
Tell Riley
|
|
|
Randy Phone #: ###-####/setbacks per plans//ACHD inspection discussed with plan review, was told not to worry with the permit being residential//
|
BLD-Footing | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | NR |
Tell Riley
|
|
|
randy Phone #: ###-####//no plans onsite//no one onsite// still need to finish rebar and elevate//water standing in some areas of footings//
|
Inspection Record Card- Bld | | | 3/10/2020 | | DONE |
|
|
|
Reprint
|
Issue PAID IN FULL permit | | | 3/2/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/26/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 2/7/2020 | 2/7/2020 | 2/26/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete: 02/19 Failed; Corrections Required...02/20 Duplex L2 PAPER
|
Inspection Record Card- Bld | | | 2/26/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2020 | | DONE |
|
|
|
Called Randy and let him know his permit was ready and what the fees are.
|
Routing - PLAN CHECK | 2/26/2020 | | 2/26/2020 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 2/26/2020 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2020 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 2/26/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/26/2020 | | DONE |
|
|
|
Customer will need to contact West Boise for Sewer
|
Plan resubmittals received | | | 2/24/2020 | | DONE |
|
|
|
applicant dropped off resubmittal
|
1st review completed | | | 2/19/2020 | | FAIL |
Rob Patrick
|
|
|
1st Review Complete: 02/19 Failed; Corrections Required
|
Routing - PLAN CHECK | 2/14/2020 | | 2/19/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - MECHANICAL | 2/12/2020 | | 2/14/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/7/2020 | | 2/12/2020 | | PASS |
Jeff Lowe
|
|
|
|
Route to Impact Fee Review | 2/7/2020 | 2/10/2020 | 2/10/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 2/7/2020 | | 2/7/2020 | | PASS |
Doug Chausow
|
|
|
7800 W Crestwood Dr
7822 W Crestwood Dr
|
Routing - PUBLIC WORKS | 2/7/2020 | | 2/7/2020 | | PASS |
Morgan Webb
|
|
|
CONTACT WEST BOISE SEWER DISTRICT
|
Telephone call | | | 2/7/2020 | | DONE |
|
|
|
NO ACHD FEES SEE DOCUMENTS
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2020 | | DONE |
|
|
|
|
Intake Approval | | | 2/7/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2020 | | DONE |
|
|
|
|
Application received | | 2/7/2020 | | | |
|
|
|
|