BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | NR |
Dave Hannah
|
|
|
Sean Phone #: ###-#### needs other traders to final first
|
BLD-Final | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | NR |
Dave Hannah
|
|
|
screened // Sean Phone #: ###-####-0282
|
BLD-Wall cover | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: 6198890305 >> Inspection requested via mobile web by Shawn
|
Issue PAID IN FULL permit | | | 3/12/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Crystal Rain
|
|
|
Not enough information: what is the elevation of the proposed porch? How far from the front property line will the structure be?
|
Routing Walk-In (BLD) | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | DONE |
Crystal Rain
|
|
|
|
Routing Walk-In (Zoning) | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Crystal Rain
|
|
|
|
Plan assigned to (JAB) Josh | 2/24/2020 | 2/24/2020 | 3/11/2020 | | PASS |
Josh Bogle
|
|
|
02/28 remodel, paper - 1st done
|
Routing - PLAN CHECK | 3/11/2020 | | 3/11/2020 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/11/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/11/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 3/11/2020 | | DONE |
|
|
|
MET
|
Telephone call | | | 3/11/2020 | | |
|
|
|
Call out to Shawn (applicant) Letting him know permit fees and that the permit is ready
|
Routing - PLAN CHECK | 2/24/2020 | | 2/27/2020 | | FAIL |
Josh Bogle
|
|
|
waiting for revised large prints
|
Routing Walk-In (BLD) | 2/24/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Josh Bogle
|
|
|
accepted for level two review, and routed
|
Routing - MECHANICAL | 2/24/2020 | | 2/24/2020 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (BLD) | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/10/2020 | | 2/10/2020 | | FAIL |
Josh Bogle
|
|
|
plans lacked structural details, engineering, ACCA report
|
1st review completed | | | 2/10/2020 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/10/2020 | | | |
|
|
|
|