BLD-Wall Bracing | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PASS |
Mike Jordan
|
|
|
shear // mike Phone #: ###-####
|
BLD-Conference | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | DONE |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|
BLD-Footing | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Footings for patiot cover.
|
BLD-Foundation | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Mike Jordan
|
|
|
wall // Bill Phone #: ###-####
|
BLD-Footing | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Mike Jordan
|
|
|
michael Phone #: ###-####
|
OVERRIDE | | | 3/12/2020 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Jeff Lowe
|
|
|
accessory structure is smaller than approved and additon to home is larger than the home which still complies with CZC19-00078
|
Routing Walk-In (BLD) | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/12/2020 | | 3/12/2020 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/12/2020 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/12/2020 | | DONE |
|
|
|
PLAN MOD
|
Plan Modification Accepted | | | 3/12/2020 | | DONE |
|
|
|
change set backs and adding patio cover
|
Issue PAID IN FULL permit | | | 2/24/2020 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 2/24/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/20/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/18/2020 | 2/18/2020 | 2/20/2020 | | PASS |
Josh Bogle
|
|
|
02/24 addition/garage, paper
|
Routing - PLAN CHECK | 2/18/2020 | | 2/20/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/20/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/20/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Telephone call | | | 2/20/2020 | | DONE |
|
|
|
LVM for Michael letting know of fees due and that the permit is ready to be picked up.
|
Permit Ready to Issue | | | 2/20/2020 | | DONE |
|
|
|
MET
|
Routing - MECHANICAL | 2/18/2020 | | 2/19/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing Walk-In (Zoning) | 2/18/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/18/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Josh Bogle
|
|
|
took in for level two review - routed
|
Application received | | 2/18/2020 | | | |
|
|
|
|