Permit Information
Permit NumberBLD20-01075
StatusIssued
Name STROTH GENERAL
Site Address 2800 S MAPLE GROVE RD
Project NameMaple Grove Fire Sprinkler
Customer Number 
ePlanReviewYes
Description
(MAPLE GROVE ELEMENTARY) Permit for new ceiling insulation in existing 45,000 sq ft school building. Approval is contingent upon adhering to the approved plans on file. Work to include: Provide blown in batt insulation between existing roof deck and existing gypsum board. Upgrade agreement done under BLD18-00776. This building is fire sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JJN**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Conference8/3/20208/3/20208/3/2020PDONE
DetailsTroy Cobbley
Contractor, engineer and myself discussed whether the canopies require interior sprinkler protection. I referenced the requirements of NFPA 13.
BLD-Conference7/23/20207/24/20207/24/2020APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rick pew class rooms and kitchin ok
BLD-Ceiling Grid Inspection7/14/20207/15/20207/15/2020PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by rick pew. A C/N notice was issued to draftstop concealed area bewtween hardlid and grid ceiling in areas not to exceed 3000 s.f. or provide sprinkler coverage.
FIRE-Conference7/9/20207/9/20207/9/2020ADONE
DetailsTroy Cobbley
See the city approved plans for additional areas where insulation has been added.

Phone #: ###-#### Inspection requested via web by rick pew
FIRE-Conference7/8/20207/8/20207/8/2020PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
FIRE-Conference6/30/20206/30/20206/30/2020PDONE
DetailsTroy Cobbley
See the city approved plans for three locations at the main entry lobby where insulation in concealed space has been verified.

Phone #: ###-#### Inspection requested via web by rick pew
FIRE-Conference6/19/20206/22/20206/22/2020PDONE
DetailsTroy Cobbley
See the city approved plans for additional rooms where insulation in void has been verified.

Phone #: ###-#### Inspection requested via web by James Ressler
FIRE-Conference6/18/20206/19/20206/19/2020PCANC
DetailsJim Page
Conference cancelled per conversation with point of contact, will be rescheduled for a later date.

Phone #: ###-#### Inspection requested via web by James Ressler
FIRE-Conference6/9/20206/10/20206/10/2020PPASS
DetailsTroy Cobbley
See the city approved plans for rooms marked where insulation has been verified. Phone #: ###-#### Inspection requested via web by rick pew
FIRE-Conference6/9/20206/10/20206/9/2020ACANC
DetailsTroy Cobbley
###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
FIRE-Conference6/1/20206/2/20206/2/2020PDONE
DetailsTroy Cobbley
See the city approved plans for additional rooms verified for insulation in the attic space. Phone #: ###-#### Inspection requested via web by rick pew
FIRE-Conference5/28/20205/28/20205/28/2020PDONE
DetailsTroy Cobbley
See the city approved plans for rooms marked "ok" and dated where insulation in the attic space has been verified. Phone #: ###-#### Inspection requested via web by rick pew
FIRE-Conference5/22/20205/26/20205/26/2020PDONE
DetailsTroy Cobbley
RIck and I discussed ways to verify the installation of the insulation in the attic spaces.
Phone #: ###-#### Inspection requested via web by rick pew
BLD-Conference5/21/20205/21/20205/21/2020PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by rick pew
Issue PAID IN FULL permit  5/18/2020 DONE
Inspection Record Card- Bld  5/18/2020 DONE
Telephone call  5/15/2020 DONE
send email to Will Longstroth to inform him that not all fees were paid
Plan assigned to (J_N)4/17/20204/17/20204/21/2020 DONE
DetailsJenny Nelson
04/21 L1 Maple Grove Elementary school ePlan
Routing - PLAN CHECK4/17/2020 4/21/2020 PASS
DetailsJenny Nelson
1st review completed  4/21/2020 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  4/21/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  4/21/2020 DONE
All MET will@strothgeneral.com
GC

Revised Values
Routing - FIRE4/17/20204/17/20204/20/2020 PASS
DetailsErika Akin
Building permit to add blown in insulation above the ceiling grid to avoid requirement of sprinklers in the concealed space. Fire Sprinkler Reviewer and Inspector to verify requirements are met for this condition. A seperate Fire sprinkler permit will be required. System shall be designed and installed in compliance with NFPA 13.
Intake Approval  4/15/2020 PASS
DetailsJavier Guzman
Intake Approval  4/9/2020 FAIL
DetailsJulie Romig
To complete your application, please provide the following:
- Completed 518 submittal checklist found here, along with any other applicable drawings/documents required by checklist:
https://www.cityofboise.org/media/8479/518-minor-ti-submittal-checklist_oct-2019-fillable.pdf
- Form 304 Registered Design Professional form, signed by owner:
https://www.cityofboise.org/media/9161/304-registered-design-professional_dec-2019_fillable.pdf
- Drawings uploaded as individual sheet files named per City of Boise naming convention (ie G01_Cover Sheet).
Application received  3/27/2020 DONE
Application submitted via PDS Online on Mar 27 2020 11:29AM