FIRE-Conference | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | DONE |
Troy Cobbley
|
|
|
Contractor, engineer and myself discussed whether the canopies require interior sprinkler protection. I referenced the requirements of NFPA 13.
|
BLD-Conference | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by rick pew class rooms and kitchin ok
|
BLD-Ceiling Grid Inspection | 7/14/2020 | 7/15/2020 | 7/15/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by rick pew. A C/N notice was issued to draftstop concealed area bewtween hardlid and grid ceiling in areas not to exceed 3000 s.f. or provide sprinkler coverage.
|
FIRE-Conference | 7/9/2020 | 7/9/2020 | 7/9/2020 | A | DONE |
Troy Cobbley
|
|
|
See the city approved plans for additional areas where insulation has been added.
Phone #: ###-#### Inspection requested via web by rick pew
|
FIRE-Conference | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
|
FIRE-Conference | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | DONE |
Troy Cobbley
|
|
|
See the city approved plans for three locations at the main entry lobby where insulation in concealed space has been verified.
Phone #: ###-#### Inspection requested via web by rick pew
|
FIRE-Conference | 6/19/2020 | 6/22/2020 | 6/22/2020 | P | DONE |
Troy Cobbley
|
|
|
See the city approved plans for additional rooms where insulation in void has been verified.
Phone #: ###-#### Inspection requested via web by James Ressler
|
FIRE-Conference | 6/18/2020 | 6/19/2020 | 6/19/2020 | P | CANC |
Jim Page
|
|
|
Conference cancelled per conversation with point of contact, will be rescheduled for a later date.
Phone #: ###-#### Inspection requested via web by James Ressler
|
FIRE-Conference | 6/9/2020 | 6/10/2020 | 6/10/2020 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for rooms marked where insulation has been verified. Phone #: ###-#### Inspection requested via web by rick pew
|
FIRE-Conference | 6/9/2020 | 6/10/2020 | 6/9/2020 | A | CANC |
Troy Cobbley
|
|
|
###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
|
FIRE-Conference | 6/1/2020 | 6/2/2020 | 6/2/2020 | P | DONE |
Troy Cobbley
|
|
|
See the city approved plans for additional rooms verified for insulation in the attic space. Phone #: ###-#### Inspection requested via web by rick pew
|
FIRE-Conference | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | DONE |
Troy Cobbley
|
|
|
See the city approved plans for rooms marked "ok" and dated where insulation in the attic space has been verified. Phone #: ###-#### Inspection requested via web by rick pew
|
FIRE-Conference | 5/22/2020 | 5/26/2020 | 5/26/2020 | P | DONE |
Troy Cobbley
|
|
|
RIck and I discussed ways to verify the installation of the insulation in the attic spaces. Phone #: ###-#### Inspection requested via web by rick pew
|
BLD-Conference | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by rick pew
|
Issue PAID IN FULL permit | | | 5/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/18/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2020 | | DONE |
|
|
|
send email to Will Longstroth to inform him that not all fees were paid
|
Plan assigned to (J_N) | 4/17/2020 | 4/17/2020 | 4/21/2020 | | DONE |
Jenny Nelson
|
|
|
04/21 L1 Maple Grove Elementary school ePlan
|
Routing - PLAN CHECK | 4/17/2020 | | 4/21/2020 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 4/21/2020 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 4/21/2020 | | DONE |
|
|
|
All MET will@strothgeneral.com
GC
Revised Values
|
Routing - FIRE | 4/17/2020 | 4/17/2020 | 4/20/2020 | | PASS |
Erika Akin
|
|
|
Building permit to add blown in insulation above the ceiling grid to avoid requirement of sprinklers in the concealed space. Fire Sprinkler Reviewer and Inspector to verify requirements are met for this condition. A seperate Fire sprinkler permit will be required. System shall be designed and installed in compliance with NFPA 13.
|
Intake Approval | | | 4/15/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 4/9/2020 | | FAIL |
Julie Romig
|
|
|
To complete your application, please provide the following:
- Completed 518 submittal checklist found here, along with any other applicable drawings/documents required by checklist:
https://www.cityofboise.org/media/8479/518-minor-ti-submittal-checklist_oct-2019-fillable.pdf
- Form 304 Registered Design Professional form, signed by owner:
https://www.cityofboise.org/media/9161/304-registered-design-professional_dec-2019_fillable.pdf
- Drawings uploaded as individual sheet files named per City of Boise naming convention (ie G01_Cover Sheet).
|
Application received | | | 3/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2020 11:29AM
|