BLD-Energy code compliance | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | PART |
Tell Riley
|
|
|
ok with video/photo // Chris Phone #: ###-####//let Lucas know onsite areas that need fixed--he will fix take photos and hang lid to blow in the attic//2nd floor knee wall VB needs to be on warm side of the wall--let Chris know--will need to verify//other walls that were opened/furred out have had the cavity filled//
|
BLD-Framing/Rough-in | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PART |
Tell Riley
|
|
|
screened // Chris Phone #: ###-####//work accordig to engineering was completed//engineers letter addressed sistered joists at main floor--they are ok, other areas are existing conditions//trades sign offs ok//corrections made, many areas are existing conditions, code compliance was acheived where possible or areas that are exposed//ok to insulate//
|
BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | NR |
Tell Riley
|
|
|
Chris - */non occupied residence SCREENED*/ Phone #: ###-####//new engineering provided for part of the corrections--still need engineering for underfloor//patio is still under review//some areas of concern are existing wall heights and same use//Chris will provide clarification from engineer on part of the new engineering//
|
CHANGE STATUS TO (ISS) | | | 7/13/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/24/2020 | 6/24/2020 | 7/10/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/10/2020 | | 7/10/2020 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/10/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Intake Approval | | | 7/6/2020 | | FAIL |
|
|
|
Prescreen Plan Mod #1
1. New engineering not uploaded. Please upload engineering documents requested by inspector.
|
Plan Modification Accepted | | | 6/24/2020 | | |
|
|
|
engineering requested by inspector
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | NR |
Tell Riley
|
|
|
screened // chris Phone #: ###-####//used as conference to discuss structural issues//
|
BLD-Framing/Rough-in | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | FAIL |
Tell Riley
|
|
|
Chris *screened* Phone #: ###-####//left correction notice and called Chris//need more detailed plans for structural//noted on correction, may need structural evaluation from engineer//
|
Inspection Record Card- Bld | | | 4/21/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/20/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/9/2020 | 4/9/2020 | 4/17/2020 | | PASS |
Josh Bogle
|
|
|
04/15 remodel, ePlan
|
Routing - PLAN CHECK | 4/9/2020 | | 4/17/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/17/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 4/17/2020 | | DONE |
|
|
|
met
|
Routing - MECHANICAL | 4/14/2020 | | 4/14/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/9/2020 | | 4/9/2020 | | PASS |
Sue Cummings
|
|
|
Interior model only
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2020 | | DONE |
|
|
|
no intake fee
|
Intake Approval | | | 4/9/2020 | | PASS |
|
|
|
|
Application received | | | 4/8/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 8 2020 1:22PM
|