Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD20-01199
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 250 S 5TH ST Unit: STE 600
Project NameAHRENS & DEANGELI LAW GROUP
Customer Number 
ePlanReviewYes
Description
(AHRENS & DEANGELI LAW GROUP) Permit to remodel existing 688 sq ft office space within an existing 8,933 sq ft tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: remove select non bearing partition wall; install 3 modular office workstations; electrical work; and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is fire sprinklered for high rise building. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JJN**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20208/12/20208/12/2020APASS
DetailsBrandon Shaw
Call Tom when you’re on your way. Thank you Phone #: ###-#### Inspection requested via web by tom mccalister
DOC - Permit Finaled8/12/20208/12/20208/12/2020PPASS
DetailsBrandon Shaw
FIRE-Final Inspection8/7/20208/11/20208/11/2020APASS
DetailsJim Page
No fire sprinkler modifications for area of work, no fire alarm modifications for area of work, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.

Give Tom a call when in route. Phone #: ###-#### Inspection requested via web by tom mccalister
BLD-Final8/6/20208/7/20208/8/2020ANR
DetailsDave Hannah
SCREENED // Tom Phone #: ###-#### needs fire life saftey first
Permit Ready to Issue  4/21/2020 DONE
Issue PAID IN FULL permit  4/21/2020 DONE
Inspection Record Card- Bld  4/21/2020 DONE
Telephone call  4/21/2020 DONE
email permit and inspection card- office@sl-builders.com
Route to Impact Fee Review4/20/20204/23/20204/20/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan assigned to (J_N)4/15/20204/15/20204/20/2020 DONE
DetailsJenny Nelson
04/20 L1 AHRENS & DEANGELI LAW GROUP ePlan
Routing - PLAN CHECK4/15/2020 4/20/2020 PASS
DetailsJenny Nelson
1st review completed  4/20/2020 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  4/20/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  4/20/2020 DONE
ALL MET
GC
Revised Certificate of Value
Routing - Addressing4/15/2020 4/15/2020 PASS
DetailsDoug Chausow
Suite 600
Routing - PUBLIC WORKS4/15/2020 4/15/2020 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Intake Approval  4/14/2020 PASS
DetailsJavier Guzman
Intake Approval  4/13/2020 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet A0.0. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
Application received  4/8/2020 DONE
Application submitted via PDS Online on Apr 8 2020 6:40PM
First Notice8/12/20208/12/2020   
DetailsBrandon Shaw