BLD-Final | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Tell Riley
|
|
|
Call 15 minutes.... ok with video/photo // Gabe Phone #: ###-####
|
DOC - Permit Finaled | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | PASS |
Tell Riley
|
|
|
call 15 mins-Gabe- *screened* Phone #: ###-####//truss corrections have been completed//
|
BLD-Framing/Rough-in | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | FAIL |
Tell Riley
|
|
|
Gabe *screened* Phone #: ###-####//engineering provided for fix of trusses modified for pitch change--the engineering fix has not been completed onsite, the fix needs to reflect the approved engineering fix//let Gabe know//
|
BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 | A | PART |
Tell Riley
|
|
|
call 15 minutes before.. SCREENED // dave Phone #: ###-####//most corrections made//still need engineers approval on trusses that the top chord was cut and replaced//see correction notice onsite//
|
BLD-Framing/Rough-in | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | FAIL |
Tell Riley
|
|
|
Gabe, *screened* Shop not connected to home Phone #: ###-####//Correction notice issued for framing corrections//truss issues need to be addressed and new engineering provided to reflect the installation and modification that was completed onsite//
|
BLD-Wall Bracing | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | PASS |
Tell Riley
|
|
|
Jack Phone #: ###-####//ok when HD galvanized nails added at pt plate//
|
BLD-Framing/Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | P | CANC |
Tony Young
|
|
|
Joe Phone #: ###-####// needs trades
|
BLD-Framing/Rough-in | 6/23/2020 | 6/24/2020 | 6/24/2020 | P | CANC |
Tell Riley
|
|
|
Jack Phone #: ###-####
|
BLD-Foundation | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PART |
Tell Riley
|
|
|
stem- Dustin *screened* Phone #: ###-####//WIP-still installing rebar in wall//setbacks still appear to be ok based on front pin being in line with existing fence//
|
BLD-Footing | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | PART |
Tell Riley
|
|
|
screened // Dustin Phone #: ###-####//pin found in front//appears to be right in line with existing fence//setbacks measure roughly 5' 2" from this line//rear setbacks over 20 feet--15' plus from center of canal//re-verify at wall inspection//
|
BLD-Footing | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | CANC |
Tell Riley
|
|
|
Screened- Dustin Phone #: ###-####
|
BLD-Footing | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | NR |
Tell Riley
|
|
|
Dustin Phone #: ###-####//not ready//need approved plans onsite//contractor states property pin is in front--will check on re-inspect//need verification of setbacks from canal in back--waiting for call from zoning//
|
Plan assigned to (RDP) | 5/12/2020 | 5/12/2020 | 5/18/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete 05/14 Failed: 05/04 New Shop ePlan
|
Routing - PLANNING | 5/18/2020 | | 5/18/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - PLAN CHECK | 5/18/2020 | | 5/18/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2020 | | DONE |
Rob Patrick
|
|
|
|
Telephone call | | | 5/18/2020 | | DONE |
|
|
|
Per ROB P. No ESC No Energy
|
Permit Ready to Issue | | | 5/18/2020 | | DONE |
|
|
|
MET
|
Issue PAID IN FULL permit | | | 5/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/18/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 5/15/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLAN CHECK | 5/12/2020 | | 5/14/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 5/14/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Plan assigned to (JAB) Josh | 4/28/2020 | 4/28/2020 | 5/12/2020 | | DEFR |
Josh Bogle
|
|
|
05/04 shop, ePlan
|
Routing - PLANNING | 4/28/2020 | | 4/28/2020 | | FAIL |
Crystal Rain
|
|
|
North corner roof eave appears to encroach beyond the 2' allowed overhang.
|
Intake Approval | | | 4/28/2020 | | PASS |
|
|
|
|
Application received | | | 4/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 27 2020 5:23PM
|