Permit Information
Permit NumberBLD20-01731
StatusIssued
Name SNOWCAP CONSTRUCTION LLC
Site Address 4410 W EMERALD ST
Project NameEmerald Row House
Customer NumberDEMO BLD19-02153
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 1700 sq. ft., two story (first story 861 sq. ft., second story 839 sq. ft) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 142 sq. ft. of covered patio/porch and a 494 sq. ft. attached garage per the approved plans and any notations. C-2D zoning and setbacks per planning. D_S
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation8/4/20208/4/20208/4/2020PPASS
DetailsTell Riley
BLD-Footing7/31/20208/3/20208/3/2020PPART
DetailsTell Riley
SCREENED // Pat Phone #: ###-####//WIP//double check setbacks at wall inspection//
Issue PAID IN FULL permit  7/21/2020 DONE
Inspection Record Card- Bld  7/21/2020 DONE
OVERRIDE  7/20/2020  
Permit Ready to Issue  7/20/2020 DONE
Plan assigned to (D_S) Debbie6/1/20206/1/20207/17/2020 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK7/17/2020 7/17/2020 PASS
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  7/17/2020 DONE
DetailsDebbie Sanine
Plan Reviewer's activity  7/7/2020 DONE
DetailsDebbie Sanine
Pending signed and stamped eng. calcs from applicant for the covered front porch
1st review completed  6/16/2020 FAIL
DetailsDebbie Sanine
Routing - PLAN CHECK6/1/2020 6/16/2020 FAIL
DetailsDebbie Sanine
Routing - PLANNING6/1/2020 6/4/2020 PASS
DetailsKatelyn Menuge
Redlined Planning Requirements.
Route to Impact Fee Review6/1/20206/4/20206/2/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - Addressing6/1/2020 6/2/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/1/2020 6/2/2020 PASS
DetailsCandy A. Nichols
CREDIT FOR DEMO
Routing - MECHANICAL6/1/2020 6/2/2020 PASS
DetailsChad Schwendiman
Intake Approval  6/1/2020 FAIL
3rd prescreen: Please provide a cross section through the entire building (only a half section was shown)
Plans ACCEPTED BY PLAN TECH  6/1/2020 DONE
Intake Approval  6/1/2020 PASS
Recd Pcfee & Taken To Pln CK  6/1/2020 DONE
Intake Approval  5/29/2020 FAIL
Corrections have not been fully met. We have deleted all drawings in the drawings folder. Please upload the drawings a single file with the correct file names. Please see the link below for our submittal standards.
https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
Intake Approval  5/27/2020 FAIL
All drawings in the drawings folder must be uploaded as individual files with file names that includes what is on the plan. (example: A1 Site Plan or Site Plan)
Application received  5/26/2020 DONE
Application submitted via PDS Online on May 26 2020 9:47PM