BLD-Foundation | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 | P | PART |
Tell Riley
|
|
|
SCREENED // Pat Phone #: ###-####//WIP//double check setbacks at wall inspection//
|
Issue PAID IN FULL permit | | | 7/23/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/23/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/22/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 6/2/2020 | 6/2/2020 | 7/22/2020 | | DONE |
Rob Patrick
|
|
|
2nd Review Complete 07/21 Failed: 06/15 sfd L1 ePlan
|
Routing - PLAN CHECK | 7/22/2020 | | 7/22/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2020 | | DONE |
Rob Patrick
|
|
|
|
Telephone call | | | 7/22/2020 | | DONE |
|
|
|
emailed Rob letting him know we will need full sized drawings uploaded into ePlan before we can stamp.
|
Permit Ready to Issue | | | 7/22/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/21/2020 | | 7/21/2020 | | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 7/8/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 6/2/2020 | | 7/8/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLANNING | 6/2/2020 | | 6/4/2020 | | PASS |
Katelyn Menuge
|
|
|
Redlined Planning Requirements
|
Route to Impact Fee Review | 6/2/2020 | 6/5/2020 | 6/3/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/2/2020 | | 6/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/2/2020 | | 6/3/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - MECHANICAL | 6/2/2020 | | 6/3/2020 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/2/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/1/2020 | | FAIL |
|
|
|
Please provide a cross section of at least one full side of the house. (only a wall section is provide now)
|
Intake Approval | | | 5/29/2020 | | FAIL |
|
|
|
The drawings are uploaded as packets. Please re upload the drawings as single files with only one page with the correct file names (example A1 Site Plan or Site Plan)
(deleted all drawings, there was 6 packets uploaded -TCH)
|
Application received | | | 5/28/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 28 2020 10:01PM
|