First Notice | | 8/20/2020 | 8/10/2020 | | DONE |
|
|
|
recieved final values done- added fees to ELE and PLM and email to Christina
|
Permanent Occupancy | | | 8/10/2020 | | DONE |
|
|
|
|
BLD-Final | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | PASS |
Tell Riley
|
|
|
Call ahead John - */Screnned*/ Phone #: ###-####//corrections made//accessible route is currently only hard surface underlayment//
|
BLD-Final | 7/31/2020 | 8/3/2020 | 8/3/2020 | P | NR |
Tell Riley
|
|
|
SCREENED // Todd Phone #: ###-####//see Todd for correction notice for final finishes for accessible routes, finishes and restrooms//
|
FIRE-Final Inspection | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signature provided on permit sign off card.
SCREENED // Todd Phone #: ###-####
|
BLD-Final | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | CANC |
Tell Riley
|
|
|
screened // Todd Phone #: ###-####//needs fire life safety pass prior to final//
|
FIRE-Final Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | FAIL |
Mike Jordan
|
|
|
screened // Todd Phone #: ###-####. Provide occupant load sign, sticker on the door and exterior emergency lighting. The B occupancy is ok.
|
Route to Impact Fee Review | 7/14/2020 | 7/17/2020 | 7/15/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 7/15/2020 | | DONE |
|
|
|
all met (tjwilcomb@jwci.com)
NEED GC
NEED REV VALUE
|
Issue PAID IN FULL permit | | | 7/15/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/15/2020 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/17/2020 | 6/17/2020 | 7/14/2020 | | PASS |
Javier Guzman
|
|
|
07/09 L3 Idaho Shaolin ePlan, fire
|
1st review completed | | | 7/14/2020 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2020 | | DONE |
|
|
|
|
Routing - FIRE | 6/17/2020 | 6/17/2020 | 7/13/2020 | | PASS |
Joe Bruce
|
|
|
Plan Review Report attached to case.
|
Routing - Addressing | 6/17/2020 | | 7/10/2020 | | PASS |
Doug Chausow
|
|
|
Signed off in ePlan by PW Addressing Doug Chausow
|
Routing - PLAN CHECK | 6/17/2020 | | 7/8/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 6/17/2020 | | 6/22/2020 | | PASS |
Morgan Webb
|
|
|
NO NEW FEES
|
Routing - PLANNING | 6/17/2020 | | 6/18/2020 | | PASS |
David Moser
|
|
|
|
Intake Approval | | | 6/16/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 6/12/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provided 518 checklist is blank, complete and re-upload (Incomplete submittals will not be accepted)
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet G1.2 and G1.3 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet G1.1. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Application received | | | 6/9/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2020 1:17PM
|