Plan Modification Accepted | | | 8/10/2020 | | DONE |
|
|
|
Plan modification for corrected site plan
|
BLD-Final | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by David Dexter
|
BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | PEND |
Tell Riley
|
|
|
LATE AM inspection requested if at all possible. Phone #: ###-#### Inspection requested via web by David Dexter//site plan does not reflect onsite conditions, shows cover on north west corner of house, actually will be located on northeast--need to submit new site plan to relect actual conditions onsite, and east side property setbacks//footings appear to meet minimum depth and width per the engineering//pour at own risk if completed prior to updated site plan//
|
Permit Ready to Issue | | | 7/6/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 7/6/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/12/2020 | 6/12/2020 | 7/2/2020 | | PASS |
Josh Bogle
|
|
|
06/16 patio cover, ePlan - 1st done
|
Routing - PLAN CHECK | 7/2/2020 | | 7/2/2020 | | PASS |
Josh Bogle
|
|
|
ESC no - Energy no
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLAN CHECK | 6/12/2020 | | 6/25/2020 | | FAIL |
Josh Bogle
|
|
|
engineering not legible
|
1st review completed | | | 6/25/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 6/12/2020 | | 6/12/2020 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 6/12/2020 | | PASS |
|
|
|
|
Application received | | | 6/11/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 11 2020 2:24PM
|
Plan assigned to (JAB) Josh | 8/10/2020 | 8/10/2020 | | | |
Josh Bogle
|
|
|
08/14 patio Mod
|
Routing - PLAN CHECK | 8/10/2020 | | | | |
Josh Bogle
|
|
|
|
Routing - PLANNING | 8/10/2020 | | | | |
|
|
|
|