Final | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
James Ady
|
|
|
Please call Chris to sign off for final. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo final ok
|
Final | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | CANC |
James Ady
|
|
|
Please call Rafael for final electrical inspection for ACECO building. Separate permit has been set up for office furniture in order to close out currently installed electrical system. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo
|
Final | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PART |
James Ady
|
|
|
Please call Rafael for final inspection. Office furniture connections to be excluded and to be installed and inspected under a new permit. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Correct MC connectors installed on mini-split units. Compessor Disc. installed. Furniture has not been installed at this time. Unable to final Electrical permit for building until new permit for funiture install has been acquired. partial final ok
|
Permanent Service | 7/22/2020 | 7/22/2020 | 7/22/2020 | A | CANC |
James Ady
|
|
|
Please call Chris for inspection of meter pedestal for permanent service. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Need seperate permit for Pedistal
|
Permanent Service | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | CANC |
James Ady
|
|
|
Call Chris for inspection of street lighting meter pedestal. Thanks! Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo
|
Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PART |
James Ady
|
|
|
Final inspection details. Thanks! ;) Phone #: ###-#### Inspection requested via web by Rafael Castillo Rough in inspections done under permit ELE20-00556. All items have been documented under that permit number. Items left for Final: Correct MC conectors for mini-split units, Feeders for compressor and Disc., Funiture whips. Partial final only ok.
|
Electrical Rough-In | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
James Ady
|
|
|
Please call Joe for grid ceiling inspection of CMM and surface prep rooms. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo CMM room and reception ceiling only ok to cover
|
Final | 7/8/2020 | 7/8/2020 | 7/9/2020 | P | NR |
James Ady
|
|
|
Please call Joe for grid ceiling inspection of CMM and surface prep rooms. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Not ready
|
Electrical Rough-In | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | FAIL |
James Ady
|
|
|
Please call Joe for grid ceiling inspection of CMM and surface prep rooms. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 1st floor office ceiling covered prior to inspection. Remove tiles and recall
|
Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
James Ady
|
|
|
Please call Bobby for inspection of single user restroom. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Restroom only ok to cover
|
Electrical Rough-In | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
James Ady
|
|
|
Call Bobby for inspection of north wall conduit in wall and to discuss office R/I.
Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo North exterior wall only ok to cover. (Discussed running MC cable prior to being "dried in" MC and EMT ok to be ran)
|
Electrical Rough-In | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
James Ady
|
|
|
Call Bobby for ufer ground inspection. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo ufer only ok to cover
|
Electrical Rough-In | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
James Ady
|
|
|
Please call Bobby for underground inspection at north end of building for feeders under footing. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo ok to cover
|
Issue PAID IN FULL permit | | | 6/18/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/18/2019 | | DONE |
|
|
|
This permit was created on the web by Cathy Duchek
|
First Notice | 8/4/2020 | 8/4/2020 | | | |
James Ady
|
|
|
|