Final | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by robert jangula Ok final. Counter recepts to left and right of kitch sink are installed in the window ledge face up. They are not physically in the counter top. The face of recepts are about 3" above work surface.
|
Electrical Rough-In | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
James Ady
|
|
|
Call for access- Nick Phone #: ###-#### Whole house rewire rough in ok (Smart home system. Home will need programed before final. All required lighting shall be opperable. Key pads/Smart switches at Entry doors shall have outside and inside lights programed to them or provide timer program for exterior lighting.)
|
Permanent Service | 12/4/2019 | 12/5/2019 | 12/4/2019 | A | PASS |
James Ady
|
|
|
Nick Phone #: ###-#### p/s u/g n ok
|
Issue PAID IN FULL permit | | | 10/7/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/7/2019 | | DONE |
|
|
|
This permit was created on the web by Robert Jangula
|