Final | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Tom Saunders
|
|
|
Code for door is 2020 Phone #: ###-#### Inspection requested via web by David Kubik... corrections made...ok to final
|
Final | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | FAIL |
Tom Saunders
|
|
|
Lock Box on back door is 2019 any questions please let me know thank you Phone #: ###-#### Inspection requested via web by David Kubik.... 1) outside service panel needs labelling 2) light required at ea egress...house and detached building-backdoor of house needs verified working...no lamps 3)water heater shall have a disconnect within sight 4) disconnect shall be clearly labelled with its on/off position..furnace disconnect 5) outlets shall be free of faults/shorts...kitchen receptacles and switches need completed...plates and installed to boxes...kitchen tile area 6) a weather proof outlet/recepticle is required at the front and back of single family dwellings-front of house 7) auxillarry building/garage needs a grounding electrode installed
|
Electrical Rough-In | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Eric Story
|
|
|
House will be unlocked any questions please give me a call be happy to go over anything. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Whole house re-wire ok to cover
|
Issue PAID IN FULL permit | | | 10/25/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/25/2019 | | DONE |
|
|
|
This permit was created on the web by David Kubik
|