Final | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | CANC |
Rock A. Hudson
|
|
|
Need final - please call Mike with any questions 208.283.9055 Phone #: ###-#### Inspection requested via web by Deb Morton Permit finaled 3-06-2020
|
Final | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | PASS |
Rock A. Hudson
|
|
|
No card posted. Final ok
|
Final | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | FAIL |
Rock A. Hudson
|
|
|
Electrical final Phone #: ###-#### Inspection requested via web by Deb Morton BCC 4-05-17 Unlawful electrical procedures. (A)- Install or alter any electrical wiring, equipment, apparatus, or fixture without first securing an electrical permit. Receptacle outlets added at verious locations aftere hours by other not covered by this permit. An electrical contractor shall secure permit for work not covered by this scope of work. Marked receptacles in question on this contractor print in red. Wiring for receptacles on level 3 conference rooms 2, 3, 4, 5, 6, and level 5 conference rooms 7, 8, 10 under shelves. Elevevator wiring to be verified by this permit as it is in scope of work.
|
Electrical Rough-In | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection on 3rd and 5th floor. Contact Roger 208.971.3789 Phone #: ###-#### Inspection requested via web by Deb Morton Areas noted grid rough in ok cover
|
Electrical Rough-In | 12/29/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Rock A. Hudson
|
|
|
5th floor rough in. Phone #: ###-#### Inspection requested via web by Deb Morton General contractor provided a camera to reach into wall and look at wiring method, boxes, and terminations, thank you. Level 5 wall rough in ok cover and listing of LED panels for level 1 confirmed.
|
Electrical Rough-In | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | PART |
Rock A. Hudson
|
|
|
Electrical rough in for the 3rd floor walls. Phone #: ###-#### Inspection requested via web by Deb Morton Plans examiner to review and determine if a building permit is required on 5th floor. Once permit for 5th exists and is issued inspections can proceed. As per Daryl DeGrange level 3 had minimal work with photos and open areas seen by Daryl. Level 3 only walls rough ok to cover.
|
Issue PAID IN FULL permit | | | 12/24/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/24/2019 | | DONE |
|
|
|
This permit was created on the web by Deb Morton
|
First Notice | 3/6/2020 | 3/6/2020 | | | |
Rock A. Hudson
|
|
|
|