Final | 4/23/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Tom Saunders
|
|
|
panel change made to complete remodel...no tile backsplash installed at time of final...boxes flush and recps and switches installed...ok to final
|
Final | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | FAIL |
Mark Moncarr
|
|
|
Please enter trough the back door. Phone #: ###-#### Inspection requested via web by Nermin Bobaric Service will need to be upgraded due to split buss panel breakers are sharing loads, not enough space left to provide each circuit with its own breaker. Can do 2 ground rods at far end of house as all patio area is concrete with a pool, dont know if any electrical is under concrete.
|
Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please enter trough back door that will be unlocked. Thank you. Phone #: ###-#### Inspection requested via web by Nermin Bobaric Kitchen sink wall rewired receptacles for an unchanged layout, adjacent wall new appliances, and cabinet layout. Kitchen remodel rough in ok cover.
|
Issue PAID IN FULL permit | | | 3/12/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/12/2020 | | DONE |
|
|
|
This permit was created on the web by Nermin Bobaric
|