Site Final | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Andy J. Long
|
|
|
Project complete and stabilized. ESC permit conditions satisfied.
|
General Inspection | 8/13/2018 | 8/13/2018 | 8/13/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/9/2018 | 4/9/2018 | 4/9/2018 | | PASS |
Michael Zawacki
|
|
|
Small disturbed area is all contained. Washout, dumpster, and port o pot all on paved lot between buildings.
|
General Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 | | PASS |
Michael Zawacki
|
|
|
No work. Building permit is still under review.
|
General Inspection | 12/4/2017 | 12/4/2017 | 12/4/2017 | | PASS |
Michael Zawacki
|
|
|
No work has started.
|
Issue & PRINT permit COM | | | 11/29/2017 | | DONE |
|
|
|
|
Application received | | | 8/30/2016 | | |
|
|
|
|