Site Final | 9/28/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Random Inspection | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout or discharges. Driveway to detached garage now paved.
|
General Inspection | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured. Contractor working on compaction. Some dirt in alley and on sidewalk, track steer is in use.
|
Application received | | | 10/31/2017 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 10/31/2017 | | DONE |
|
|
|
|