General Inspection | 5/22/2020 | 5/26/2020 | 6/1/2020 | A | PASS |
Michael Zawacki
|
|
|
No new activity. No dust, some weed growth. Site swale is full of clean drain rock.
|
Complaint Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PEND |
Andy J. Long
|
|
|
dumping concrete washout?
RP states no concrete has been poured for 3 weeks at the site.
1 or 2 piles of dumped concrete material, also looks like some stucco. Will have the swale cleaned and investigate who may have dumped the material
|
General Inspection | 4/23/2020 | 4/23/2020 | 4/24/2020 | P | PASS |
Michael Zawacki
|
|
|
Sidewalks LLc on side doing curbing, knife river delivering mud. Did not see a washout or any dumped washout on site. No construction entrance, area is prepped for road bed. Sidewalk and curbing on Boise ASve also needs to be installed.
|
General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Michael Zawacki
|
|
|
Titanium on site doing water and sewer, Boise Ave is closed. Street will need to be cleaned after being patched.
|
General Inspection | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Michael Zawacki
|
|
|
Water line installation completed. Long row of stockpiles along western perimeter, seepage bed excavated at eastern rear of site. Site needs a new entrance before any more work begins. Site below grade, lots of bare ground.
|
Site Preparation | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on site development. Permit sign posted. Using existing paved access. No trackout at time of inspection. Storm drains on Boise have sediment protection
|
Issue & PRINT permit SFD | | | 1/24/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/13/2019 | | 12/13/2019 | | DONE |
Michael Zawacki
|
|
|
Home has been demoed on site.
Site prep inspection required.
|
Application received | | | 12/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 10 2019 6:30PM
|