INSP-Final Inspection | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Katie Marron
|
|
|
Overhead hydrostatic test pass
|
INSP-Sprinkler Rough-in | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Troy Cobbley
|
|
|
Piping in the existing office areas is ok to cover.
|
INSP-Sprinkler Rough-in | 1/20/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Troy Cobbley
|
|
|
overhead rough in passed. Hard lids ok to cover. Will need an additional rough-in inspection when drops have been piped to grid.
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Troy Cobbley
|
|
|
overhead rough-in of the existing hanger passed
|
INSP-Final Inspection | 9/19/2014 | 9/22/2014 | 9/22/2014 | A | PART |
Troy Cobbley
|
|
|
Forward flush passed and the alarm bell functioned. Need the work in the existing building completed.
|
INSP-Final Inspection | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | FAIL |
Troy Cobbley
|
|
|
New hanger work is complete. Need the existing building work completed. Need electric alarm bell installed. Forward flush did not pass. Need backflow certified.
|
INSP-Sprinkler Rough-in | 8/18/2014 | 8/18/2014 | 8/18/2014 | P | PASS |
Troy Cobbley
|
|
|
The remaining second floor piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PART |
Forrest France
|
|
|
OH hydrostatic testing completed acceptable.
|
INSP-Sprinkler Rough-in | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler work above grid ceilings on the second and first floors okayed for cover at locations initialed and dated on approved plans. Discussed schedule for hydrostatic testing.
|
INSP-Sprinkler Rough-in | 8/6/2014 | 8/6/2014 | 8/6/2014 | P | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the 1st floor lobby ceiling and aeronautics office as marked and dated on plans. Noted one head to be relocated at the west open office area.
|
INSP-Sprinkler Rough-in | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PASS |
Troy Cobbley
|
|
|
2" overhead lines have been changed out to the previously approved 2 1/2". Hardlids ok to install as marked on the plans.
|
INSP-Sprinkler Rough-in | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | PASS |
Troy Cobbley
|
|
|
The remaining basement ceiling can be installed and select areas, as marked, can be installed on the first floor. Second floor piping can not be covered until plan review gives me the ok on the pipe size changes/hydralic calculations.
|
INSP-Sprinkler Rough-in | 7/8/2014 | 7/8/2014 | 7/8/2014 | P | PART |
Troy Cobbley
|
|
|
Hanger area piping rough-in passed. Could not give approval for cover on the second floor due to the approved 2 1/2" branchlines being installed as 2".
|
INSP-Sprinkler Rough-in | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Troy Cobbley
|
|
|
The underground supply line is ok for cover
|
INSP-Sprinkler Rough-in | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Troy Cobbley
|
|
|
The two hard lids for the second floor mens ands womens restrooms is ok to install.
|
INSP-Sprinkler Rough-in | 6/9/2014 | 6/10/2014 | 6/10/2014 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location marked "ok" for piping that is ok for cover.
|
INSP-Sprinkler Rough-in | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional locations where piping can be covered.
|
INSP-Sprinkler Rough-in | 5/21/2014 | 5/22/2014 | 5/22/2014 | A | PART |
Forrest France
|
|
|
Overhead work okay to cover at both the east and west side feed mains to office areas on the 2nd, 1st, and basement floor levels. Okay to cover work at one additional room as marked and dated on plans- basement level. Noted floorplan changes from original drawings.
|
INSP-Sprinkler Rough-in | 5/12/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where piping above hardlids can be covered in the basement and first floors. Overhead piping rough-in passed in these two areas as well but another cover inspection will be needed once the drops are installed.
|
INSP-Sprinkler Rough-in | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | CANC |
Troy Cobbley
|
|
|
mark Phone #: ###-#### Inspection cancelled from web by: Jeff Packham
|
INSP-Sprinkler Rough-in | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | PASS |
Troy Cobbley
|
|
|
Inspection for the hangers at teh deck passed and can be covered.
|
Permit Ready to Issue | | | 4/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 4/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 4/14/2014 | | 4/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 4/11/2014 | | 4/11/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/9/2014 | | 4/9/2014 | | FAIL |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/29/2014 | | 1/29/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/29/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/29/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 1/3/2014 | | 1/3/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/30/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2013 8:59AM
|