INSP-Final Inspection | 10/27/2015 | 10/29/2015 | 10/29/2015 | A | PASS |
Thomas Walsh
|
|
|
Final inspection of FS U/G supply line. PIV and BFP valve tampers tested with fire alarm system test. All tested OK.
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | CANC |
Thomas Walsh
|
|
|
Wrong permit # called in for this inspection. See permit # FIR14-00750 for inspection conducted today (7/30).
|
INSP-Sprinkler Rough-in | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | CANC |
Thomas Walsh
|
|
|
Wrong permit called in for this inspection - see permit # FIR14-00750 for inspections conducted today (7/30).
|
INSP-Final Inspection | 5/29/2015 | 6/1/2015 | 6/1/2015 | P | CANC |
Thomas Walsh
|
|
|
Final signoff on FSUG cannot be granted until fire alarm system interface components, including tampers and waterflows, can be completed.
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Thomas Walsh
|
|
|
FSUG hydrotest from city connection to A/S BOR - 200 psi @ 2 hours - PASSED
|
INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | CANC |
Thomas Walsh
|
|
|
Hydrotest of FSUG supply lie=ne from city connection to BOR - 200 psi at 2 hours - PASSED.
|
INSP-Supply line flush | 4/21/2015 | 4/21/2015 | 4/23/2015 | P | CANC |
Katie Marron
|
|
|
Cancelled overbooked, rescheduled for later date.
|
INSP-Supply line flush | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PART |
Katie Marron
|
|
|
Supply line flush for bldg K completed satisfactory.
|
INSP-Supply line flush | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | CANC |
Katie Marron
|
|
|
Cancelled by contractor.
|
Sprinkler Plan Check | 11/25/2014 | | 11/25/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2014 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
INSP-Sprinkler Rough-in | 9/12/2014 | 9/15/2014 | 9/15/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line including the PIV and ductile riser okay for bury provided a plan modification is done to reflect changes in pipe route, added 45 and 90, and relocated riser room.
|
Sprinkler Plan Check | 3/7/2014 | | 3/7/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/7/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/7/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/7/2014 | | 3/7/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 2/19/2014 | | 2/19/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/19/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 2/19/2014 | | 2/19/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 2/12/2014 | | 2/12/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/28/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2014 3:34PM
|