INSP-Final Inspection | 11/12/2014 | 11/12/2014 | 11/12/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work approved for final.
|
INSP-Sprinkler Rough-in | 10/7/2014 | 10/7/2014 | 10/7/2014 | A | PART |
Forrest France
|
|
|
Okay to cover remainder of fire sprinkler work at the grid ceilings.
|
INSP-Sprinkler Rough-in | 10/3/2014 | 10/6/2014 | 10/6/2014 | P | PART |
Forrest France
|
|
|
Fire sprinkler work approved for cover at the new cath lab. Need to provide a drop ceiling or extend sheetrock to the deck for upright coverage at two equipment rooms adjacent to the lab.
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/18/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/18/2014 | | 8/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 8/14/2014 | | 8/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/14/2014 | | 8/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/13/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2014 1:00PM
|