INSP-Final Inspection | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Thomas Walsh
|
|
|
Final Inspection passed. Certificates of Completion forms to be submitted electronically.
|
INSP-Sprinkler Rough-in | 9/30/2015 | 10/1/2015 | 10/1/2015 | P | PASS |
Thomas Walsh
|
|
|
Rough to cover inspection for EFG parking garage wet pipe system. System has already been hydrotested. PASSED - OK to cover all pipe for this system.
|
INSP-Sprinkler Rough-in | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PART |
Thomas Walsh
|
|
|
Test of some hard lid areas in the basement of wings EF&G. See plans for areas inspected. OK to cover pipe in these areas.
|
Permit Ready to Issue | | | 11/20/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/20/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/20/2014 | | 11/20/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 11/19/2014 | | 11/19/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/22/2014 | | 8/22/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/22/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/22/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 8/21/2014 | | 8/21/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/19/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 19 2014 9:15AM
|