Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR14-00681
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 5301 E WARM SPRINGS AVE
Project NameTerraces of Boise Bld D/Common
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting wings D. Extended coverage sprinklers and standard sprinklers are being utilized. The attic for building d will be under a separate submittal.

The Terraces of Boise - Main Building Wings C, D and E - To construct a new 94,150 square foot, three story, wood framed independent living apartment building. This is a wing of a larger building, with wings separated by two-hour firewalls. This building is being constructed on top of an underground parking garage. The parking garage is separated from the above apartment building by a three-hour horizontal separation. This building is fully fire sprinklered. The sprinklers are used for area increase. First Floor: 35,560 sq. ft. with 18 apartments and common Areas. The common area contains the main entry with porte cochere, vestibule and lobby; administrative offices, fitness and social gathering areas, including a bistro and public restrooms. Second Floor: 32,855 sq. ft. with 24 apartments and small lounge area above the lobby. Third Floor: 25,735 sq. ft. with 17 apartments. All floors contain mechanical/electrical and housekeeping areas. Wings C and D will be constructed as part of Phase I and Wing E will be constructed as part of Phase II.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/201510/14/201510/15/2015PPASS
DetailsThomas Walsh
Final Inspection passed. All previous discrepancies adequately corrected.
INSP-Sprinkler Rough-in/Hydro6/12/20156/12/20156/12/2015PPASS
DetailsThomas Walsh
Final Inspection of Bldg D wet pipe fire sprinkler system.NOTE: One remaining item to be addressed under this permit is to extend the FDC connection adjacent to the main entry lobby from its current location to extend past the roof column that it is currently obstructed by. The contractor agreed to get this done - the final acceptance was issued with this agreement.
INSP-Final Inspection6/10/20156/11/20156/11/2015APART
DetailsThomas Walsh
Final inspection of Bldg D, includinfg commons area. Need to remove protective cap on A/S in main lobby (2nd floor). Will sign off when this is completed.
INSP-Sprinkler Rough-in/Hydro6/9/20156/10/20156/10/2015ACANC
DetailsThomas Walsh
Sprinkler final inspection/sign off will be conducted after all fire alarm testing is completed.
INSP-Sprinkler Rough-in/Hydro6/5/20156/8/20156/8/2015PPART
DetailsThomas Walsh
Inspection of fire alarm system interface, including water flows of system risers, tamper devices, control valves, etc. Waterflows came in at approx. 30-40 seconds. All device addresses appeared accurate.
INSP-Final Inspection6/1/20156/2/20156/3/2015PCANC
DetailsThomas Walsh
Wet pipe final inspection pending completion of fire alarm interface, including waterflows and tampers.
INSP-Sprinkler Rough-in/Hydro5/21/20155/21/20155/21/2015PPASS
DetailsThomas Walsh

Hydrotest Wing D and commons. 200psi @ hours - Passed
INSP-Sprinkler Rough-in4/13/20154/13/20154/13/2015PPART
DetailsKatie Marron
Inspection for cover at grid ceiling areas for wing D, first floor completed. Ok to cover. Noted three painted heads, misaligned branch and two sprinklers with wrong temperature rating.
INSP-Sprinkler Rough-in4/3/20154/6/20154/6/2015PPART
DetailsScott Arellano
OK to cover hard lid areas only within corridor per approved plans and head locations.
INSP-Sprinkler Rough-in2/25/20152/25/20152/26/2015PPART
DetailsForrest France
2nd floor area D entry sheetrock lid ceiling okayed for cover with conditions to include adequate clearance for branchline piping extending through framing.
INSP-Sprinkler Rough-in2/20/20152/20/20152/20/2015PPART
DetailsForrest France
Overhead work at the sheetrock lid ceilings first floor area D east half to rated wall as annotated and dated on approved plans okay for cover.
INSP-Sprinkler Rough-in2/11/20152/12/20152/12/2015PPART
DetailsForrest France
Okayed for cover hard lid soffit ceilings completed to date as noted and initialed on approved plan sheet- partial areas only, building section D.
Permit Ready to Issue  12/30/2014 DONE
Issue and Print Permit  12/30/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Fire12/30/2014 12/30/2014 DONE
DetailsCandy A. Nichols
Sprinkler Plan Check12/29/2014 12/29/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  12/29/2014 DONE
DetailsTim Frost
Sprinkler Plan Check12/16/2014 12/16/2014 FAIL
DetailsTim Frost
Miscellaneous action  12/16/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Miscellaneous action  12/1/2014 FAIL
I had to fail this project due to time constraints. The emails of 11/25/2014 have not been answered.
Miscellaneous action  11/25/2014 PEND
This project is on hold pending answers to email.
1. Why is the Porte-Cocher and vestibule not protected.
2. Why is all of the soffits not protected.
Plan assigned to (Tim)11/25/2014 11/25/2014 DONE
DetailsTim Frost
Sprinkler Plan Check11/12/2014 11/12/2014 FAIL
DetailsTim Frost
Miscellaneous action  11/12/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)9/23/2014 9/23/2014 DONE
DetailsTim Frost
Sprinkler Plan Check9/23/2014 9/23/2014 FAIL
DetailsTim Frost
1st review completed  9/23/2014 FAIL
DetailsTim Frost
Miscellaneous action  9/23/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  9/15/2014 DONE
Application submitted via PDS Online on Sep 15 2014 12:14PM
INSP-Sprinkler Rough-in/Hydro2/10/20152/10/2015 P 
DetailsForrest France
Partial rough to cover bldg D 1st floor (soffits/hard lids ) ###-#### Leroy >> Inspection requested via web by Scott Carter II