INSP-Final Inspection | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Katie Marron
|
|
|
Scope of work completed. Final walk through completed, sprinkler pass. Sprinkler permit finaled.
|
INSP-Final Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PART |
Katie Marron
|
|
|
Final walk through completed at 2nd floor.
|
INSP-Sprinkler Rough-in | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PART |
Katie Marron
|
|
|
1st Floor ok to cover at drop ceiling per plan.
|
INSP-Sprinkler Rough-in | 3/30/2015 | 3/31/2015 | 3/30/2015 | A | PART |
Forrest France
|
|
|
Okayed for cover- inspection completed 3/30
|
INSP-Sprinkler Rough-in | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PART |
Forrest France
|
|
|
Overhead sprinkler work at the grid ceilings on the 2nd and 1st floor remodel areas approved for cover.
|
INSP-Sprinkler Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in for flex heads appears ok. Will need another rough-in when t-bar has been installed and pendants placed.
|
Sprinkler Plan Check | 2/10/2015 | | 2/10/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/10/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/10/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 2/10/2015 | | 2/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 2/9/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/9/2015 | | 2/9/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2015 3:02PM
|