Permit Information
Permit NumberFIR19-00390
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 600 W CURLING DR
Project NameThe Bomb Shelter
Customer Number 
ePlanReviewYes
Description
New wet system in an existing 2 story underground bomb shelter.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/26/20202/27/20202/27/2020PPASS
DetailsJim Page
Final fire sprinkler inspection is complete.

We would like to schedule this in conjunction with the fire alarm inspection. Please call Jeff with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in2/27/20202/27/20202/27/2020PPASS
DetailsJim Page
Rough in inspection is complete.

We would like to complete this in conjunction with our other inspection today. Please call Troy with time frame or questions Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in/Hydro1/8/20201/9/20201/9/2020ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Supply line flush1/7/20201/8/20201/8/2020APASS
DetailsJim Page
**PASS Flush of underground and remote FDC piping** MAS** 9:30 with Suez Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro1/7/20201/7/20201/7/2020PDONE
DetailsJim Page
Hydrostatic test for underground supply witnessed, no pressure loss observed.

UG Hydro. Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in12/17/201912/18/201912/18/2019APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in12/16/201912/17/201912/17/2019APART
DetailsJim Page
Due to this being a steep hiilside project, undergorund supply approved for partial cover, fittings to be left exposed and will be inspected following day.

UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in12/16/201912/16/201912/16/2019PCANC
DetailsJim Page
Rescheduled for 17DEC2019 per conversation with point of contact, this request is cancelled.

UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
CHANGE STATUS TO (ISS)  12/4/2019 DONE
Plan Modification Accepted  12/3/2019 DONE
Per Matt plan mod for underground
Plan assigned to (Stumbaugh)12/3/2019 12/3/2019 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check12/3/2019 12/3/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  12/3/2019 DONE
DetailsMark Stumbaugh
Review Time 1hr
No new devices
Permit Ready to Issue  12/3/2019 DONE
**DO NOT REISSUE - PLAN MOD**
CHANGE STATUS TO (ISS)  9/10/2019 DONE
Plan Modification Accepted  9/6/2019 DONE
start plan mod workflow per Matt at Treasure Valley Fire Protection
Plan assigned to (Stumbaugh)9/6/2019 9/6/2019 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check9/6/2019 9/6/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  9/6/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee $150.00
Permit Ready to Issue  9/6/2019 DONE
DONT ISSUE PERMIT- plan mod approved
Issue and Print Permit  6/18/2019 DONE
Plan resubmittals received  6/14/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)6/14/2019 6/14/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check6/14/2019 6/14/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  6/14/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  6/14/2019 DONE
Plan resubmittals received  6/13/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)6/13/2019 6/13/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check6/13/2019 6/13/2019 FAIL
DetailsMark Stumbaugh
Sprinkler Plan Check6/5/2019 6/7/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  6/5/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)6/5/2019 6/5/2019 DONE
DetailsMark Stumbaugh
Application received  6/4/2019 DONE
Application submitted via PDS Online on Jun 4 2019 11:46AM