INSP-Final Inspection | 2/26/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
We would like to schedule this in conjunction with the fire alarm inspection. Please call Jeff with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Jim Page
|
|
|
Rough in inspection is complete.
We would like to complete this in conjunction with our other inspection today. Please call Troy with time frame or questions Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in/Hydro | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Supply line flush | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PASS |
Jim Page
|
|
|
**PASS Flush of underground and remote FDC piping** MAS** 9:30 with Suez Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply witnessed, no pressure loss observed.
UG Hydro. Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PART |
Jim Page
|
|
|
Due to this being a steep hiilside project, undergorund supply approved for partial cover, fittings to be left exposed and will be inspected following day.
UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled for 17DEC2019 per conversation with point of contact, this request is cancelled.
UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
CHANGE STATUS TO (ISS) | | | 12/4/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/3/2019 | | DONE |
|
|
|
Per Matt plan mod for underground
|
Plan assigned to (Stumbaugh) | 12/3/2019 | | 12/3/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 12/3/2019 | | 12/3/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2019 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
No new devices
|
Permit Ready to Issue | | | 12/3/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
CHANGE STATUS TO (ISS) | | | 9/10/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/6/2019 | | DONE |
|
|
|
start plan mod workflow per Matt at Treasure Valley Fire Protection
|
Plan assigned to (Stumbaugh) | 9/6/2019 | | 9/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 9/6/2019 | | 9/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 9/6/2019 | | DONE |
|
|
|
DONT ISSUE PERMIT- plan mod approved
|
Issue and Print Permit | | | 6/18/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/14/2019 | | 6/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/14/2019 | | 6/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/14/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/13/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/13/2019 | | 6/13/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/13/2019 | | 6/13/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/5/2019 | | 6/7/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 6/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/5/2019 | | 6/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 6/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 4 2019 11:46AM
|