INSP-Final Inspection | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Permit Ready to Issue | | | 2/19/2020 | | DONE |
|
|
|
as built approved- fees due
|
CHANGE STATUS TO (ISS) | | | 2/19/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/18/2020 | | DONE |
|
|
|
as built per Brody- pipping plan
|
Plan assigned to (Stumbaugh) | 2/18/2020 | | 2/18/2020 | | DONE |
Mark Stumbaugh
|
|
|
as built per Brody- pipping plan
|
Sprinkler Plan Check | 2/18/2020 | | 2/18/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review time no fee
7 new devices
|
INSP-Sprinkler Rough-in | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Page
|
|
|
Sprinkler head coverage corrections for prop type decoration obstructions has been corrected, approved for cover. As builts must be submitted and permit reissued before final inspection.
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for area of work complete, approved for cover.
Mike Phone #: ###-####
|
Intake Approval | | | 10/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/14/2019 | | 10/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/14/2019 | | 10/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 10/14/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/14/2019 | | DONE |
|
|
|
|
Application received | | | 9/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 27 2019 7:05AM
|
Intake Approval | | | 9/27/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit issuance
|