Install a new wet sprinkler system
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/11/20202/12/20202/12/2020PPASS
DetailsTroy Cobbley
Permit finaled.

George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Conference2/11/20202/11/20202/11/2020PDONE
DetailsTroy Cobbley
I spoke to George about re-hydro testing due to the cplg change out.
INSP-Final Inspection2/10/20202/10/20202/10/2020PFAIL
DetailsJim Page
Install flexible couplings on riser, main climbing floor. Provide calc sticker on riser. Raise insulation/insulation covering in lower ceiling area off of heads. Points of attachment for sway bracing need to match detail on city approved drawings, ie through bolts and double lumber.

George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection2/5/20202/6/20202/6/2020ACANC
DetailsTroy Cobbley
To be cancelled per George Jess is the contact for this inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection2/4/20202/5/20202/5/2020AFAIL
DetailsTroy Cobbley
Not ready for final due to the project related fire alarm permit. Previous corrections for sprinkler spacing have been corrected.

George Jess is the Contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/21/20201/22/20201/22/2020APASS
DetailsTroy Cobbley
Overhead Hydro witnessed with no pressure loss. George is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/17/20201/21/20201/21/2020AFAIL
DetailsTroy Cobbley
Overhead hydo test failed based on visible loss of pressure at guage. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
Plan assigned to (Stumbaugh)1/14/2020 1/15/2020 DONE
DetailsMark Stumbaugh
plan mod per Roger Adams- to show additional fittings in main piping, riser nipple, lengths and pipe size changes.
Sprinkler Plan Check1/15/2020 1/15/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/15/2020 DONE
DetailsMark Stumbaugh
Review Time 1 hr
No new devices
Permit Ready to Issue  1/15/2020 DONE
plan mod
CHANGE STATUS TO (ISS)  1/15/2020 DONE
INSP-Sprinkler Rough-in1/14/20201/14/20201/14/2020PPART
DetailsTroy Cobbley
Need all small documents prior to next inspection. Plan mods needed showing additional fittings in main piping, riser nipple lengths and pipe size changes. Upright sprinkler heads appear to obstructed in the low roof portioin of project. Need to meet three times rule. General rough in looks okay.

George Jess is the contact for this RTC Inspection. Thank you for your help and have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
Plan Modification Accepted  1/14/2020 DONE
plan mod per Roger Adams- to show additional fittings in main piping, riser nipple, lengths and pipe size changes.
INSP-Sprinkler Rough-in/Hydro12/19/201912/20/201912/20/2019APASS
DetailsTroy Cobbley
The combustible concealed space below the ramp has been filled with insulation.

George Jess is the contact. This is for an overhead Hydro. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
Permit Ready to Issue  10/9/2019 DONE
met
Issue and Print Permit  10/9/2019 DONE
Plan resubmittals received  10/8/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check10/8/2019 10/8/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  10/8/2019 DONE
DetailsMark Stumbaugh
Base Fee $175.00
Device Fee 130 x 4.85 = $630.50
Total Fees $805.50
Sprinkler Plan Check10/3/2019 10/7/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  10/3/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/3/2019 10/3/2019 DONE
DetailsMark Stumbaugh
Application received  10/2/2019 DONE
Application submitted via PDS Online on Oct 2 2019 3:57PM