INSP-Final Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
screened // Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection request, needed flush. Tanner Phone #: ###-####
|
INSP-Supply line flush | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground flush witnessed.
Tanner *screened* Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping hydro test witnessed.
bld K // Kyle Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Troy Cobbley
|
|
|
*PASS** Ok to cover underground. Thrust blocks in place, rebar tie downs coated.**MAS**
underground // Kyle Phone #: ###-####
|
Permit Ready to Issue | | | 10/18/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/18/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/17/2019 | | 10/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/17/2019 | | 10/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 16 2019 3:21PM
|