INSP-Final Inspection | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
screened// Tanner Phone #: ###-####
|
INSP-Final Inspection | 7/27/2020 | 7/28/2020 | 7/28/2020 | P | CANC |
Troy Cobbley
|
|
|
Waiting on fire alarm interconnect. Need backflow verified and pressure relief valves. Tanner - */Screened*/ Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro for the 3rd floor witnessed.
screened // Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 7/21/2020 | 7/22/2020 | 7/22/2020 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro tests of the 1st and 2nd floors witnessed.
SCCREENED // Tanner Phone #: ###-####
|
INSP-Conference | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | CANC |
Troy Cobbley
|
|
|
I spoke to Tanner about the need to get their bond current with the State Fire Marshals office prior to an inspection. Email has been sent to Joe and Mark. I spoke to Knute with the State Fire Marshal's office. screened // Tanner Phone #: ###-####
|
INSP-Conference | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | DONE |
Troy Cobbley
|
|
|
I'm ok with the FDC being moved 1'-0" around the corner of the riser room due to interior space limitations. Tanner *screened* Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/3/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/2/2020 | | 6/2/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
As built drawings - No Fee
|
Permit Ready to Issue | | | 6/2/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan assigned to (Stumbaugh) | 3/18/2020 | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod request to add heat trace for the sprinkler system
|
Sprinkler Plan Check | 6/1/2020 | | 6/1/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 5/29/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Plans resubmitted without any changes from last submittal. Returned to applicant
|
Plan resubmittals received | | | 5/29/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/26/2020 | | 5/28/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 5/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
Emailed Bill with Alpine fire explaining what was need on as built drawings(attached in docs)
|
Plan assigned to (Stumbaugh) | 5/21/2020 | | 5/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
As builts
|
Plan resubmittals received | | | 5/21/2020 | | DONE |
|
|
|
as builts per Bill Corbit
|
INSP-Sprinkler Rough-in | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Troy Cobbley
|
|
|
The piping in the breeze way mechanical rooms is ok to cover and the heat taped piping in the breeze way is ok for cover. Tanner Phone #: ###-####
|
INSP-Final Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | CANC |
Troy Cobbley
|
|
|
screened // Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the heat trace on the cpvc piping in the breeze ways. Only acouple of the provided documents had the city approval stamp on them. At re-inspection all documents to have the approval stamp. Also the provided documentation specifically addresses the wire to be used on metallic piping. No where did it show to be used on the CPVC. The contractor needs to provide documentation this product can be used on CPVC piping or resubmit another product that can be used.
Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/27/2020 | 4/28/2020 | 4/28/2020 | P | CANC |
Troy Cobbley
|
|
|
No "on order" for the water. Could not perform hydro test. Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit scheduled. underground- Tanner *cleared* Phone #: ###-####
|
INSP-Supply line flush | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | CANC |
Troy Cobbley
|
|
|
cancel per contractor
screened // Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Troy Cobbley
|
|
|
The piping above the soffits on the 1st floor apartments is ok for cover.
*screened* requesting 8:30 - Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | CANC |
Jim Page
|
|
|
Inspection request had to cancelled due to inspection load/manpower shortage. Per conversation with point of contact, inspection request will be rescheduled by the contractor, this request is cancelled.
Screened- Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Troy Cobbley
|
|
|
The piping above the soffits on the 3rd and 2nd floors/apartments is ok for cover. screened // Tanner Phone #: ###-####
|
Plan resubmittals received | | | 3/31/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/31/2020 | | PASS |
|
|
|
|
1st review completed | | | 3/31/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/31/2020 | | 3/31/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/31/2020 | | DONE |
|
|
|
No additional review comments.
|
Permit Ready to Issue | | | 3/31/2020 | | DONE |
|
|
|
Plan Mod Met
|
CHANGE STATUS TO (ISS) | | | 3/31/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/23/2020 | | DONE |
|
|
|
3-23-19: Returned to applicant. Inadequate information has been provided. Emailed specific requirements to Bill and suggested the installer provide detailed information on a seperate fire alarm application.
|
Plan Modification Accepted | | | 3/18/2020 | | DONE |
|
|
|
plan mod request to add heat trace for the sprinkler system
|
INSP-Sprinkler Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Troy Cobbley
|
|
|
The updated drawings have been provided to me. The ok to cover in the areas previously noted stands.
Tanner Phone #: ###-####
|
Plan Modification Accepted | | | 2/7/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/7/2020 | | 2/7/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/7/2020 | | 2/7/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1 hr
No new devices
|
Permit Ready to Issue | | | 2/7/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/7/2020 | | DONE |
|
|
|
plan mod/as built
|
Plan assigned to (Lee) | 2/4/2020 | | 2/6/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Wrong plan uploaded. as built requested by Bill corbit- main relocate 2nd floor
|
Plan resubmittals received | | | 2/4/2020 | | DONE |
|
|
|
as built requested by Bill corbit- main relocate 2nd floor
|
INSP-Sprinkler Rough-in | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed for all floors for the most part. Tenting was in place at time of inspection. I agreed to give approval for cover as long as as-builts for pipe routing changes are approved by next wednesday. All parties agreed.
Bill Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | FAIL |
Jim Page
|
|
|
Southeast level 1 apartment has 2 heads that are more than 9 foot off of wall, city approved drawings show a maximum of 9 foot off of wall spacing. Inspection stopped on level 1. Looked at level 3 tenting at contractors request, found multiple areas where small amounts of pipe was exposed to attic space as well as BAT insulation resting on plumbing vent pipes provided an area for blow in insulation to compromise pocket between sheetrock and sprinkler piping, areas need corrected before cover can be approved. Grade needs to be maintained from adapter to flexible dry sprinkler as required by manufacturer specs, multiple dry heads had grade going back to adapter. Inspection stopped, a complete re-inspection will need to be performed due too deficiencies found in the first inspected areas on level 1 and 3.
To cover- Bill Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/29/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/13/2020 | | DONE |
|
|
|
Bill requested the workflow to be opened for plan mod
|
Plan assigned to (Stumbaugh) | 1/13/2020 | | 1/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 1/13/2020 | | 1/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
No New Devices
|
Permit Ready to Issue | | | 1/13/2020 | | DONE |
|
|
|
plan mod approved
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number scheduled. call ahead Bill Phone #: ###-####
|
INSP-Conference | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit numbert scheduled.
Chris Phone #: ###-####
|
Issue and Print Permit | | | 12/4/2019 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/2/2019 | | 12/3/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/3/2019 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 12/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/22/2019 | | 11/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/20/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/23/2019 | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
No changes have been made from the last submittal.
|
Intake Approval | | | 10/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/23/2019 | | 10/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 3:08PM
|