INSP-Final Inspection | 2/11/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for scope of work complete.
Needs to be done at 7:00 Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | CANC |
Jim Page
|
|
|
Scheduled for wrong day, this request is cancelled.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
1st review completed | | | 2/7/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 2/7/2020 | | 2/7/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/7/2020 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 2/7/2020 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 2/7/2020 | | DONE |
|
|
|
as built approved
|
Telephone call | | | 2/6/2020 | | DONE |
|
|
|
Mary - ECI opening for as builts
|
Plan resubmittals received | | | 2/6/2020 | | DONE |
|
|
|
Mary with ECI enginnering submitting for as builts
|
Plan assigned to (Lee) | 2/6/2020 | | 2/6/2020 | | DONE |
Lee G Meredith
|
|
|
as builts
|
Plan assigned to (Lee) | 10/28/2019 | | 10/28/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 10/28/2019 | | PASS |
|
|
|
|
1st review completed | | | 10/28/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/28/2019 | | 10/28/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/28/2019 | | DONE |
|
|
|
Quick permit passed. No review comments but there are noted requirements on the floor plan drawing.
|
Permit Ready to Issue | | | 10/28/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/28/2019 | | DONE |
|
|
|
|
Application received | | | 10/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 25 2019 11:45AM
|