Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR19-00816
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 982 N MAPLE GROVE RD
Project NameROSEWOOD APT. BLD 11
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW NFPA 13R FIRE SPRINKLER SYSTEM IN THIS NEW APARTMENT BUILDING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/12/20208/13/20208/13/2020APASS
DetailsGreg Ruxton
Passed sprinkler final.

Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection8/10/20208/10/20208/10/2020PCANC
DetailsTroy Cobbley
Call James before heading out, thanks Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/28/20205/28/20205/28/2020APASS
DetailsTroy Cobbley
Tower 4 hydro witnessed with no pressure loss.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/13/20205/13/20205/13/2020PPASS
DetailsTroy Cobbley
Overhead hydro for building 11 tower 4 failed. The other hydros passed. Overhead hydro. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/11/20205/12/20205/13/2020APART
DetailsTroy Cobbley
Overhead hydro for building 11 tower 4 failed. The other hydros passed. Overhead hydro. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/7/20205/11/20205/11/2020AFAIL
DetailsTroy Cobbley
Contact could not meet at the same time I could. Will need to be rescheduled. Overhead hydro, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in3/11/20203/12/20203/12/2020APASS
DetailsTroy Cobbley
Rough and tenting towers 3;4 passed. Piping can be covered.. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in3/10/20203/10/20203/10/2020PPART
DetailsTroy Cobbley
Rough-in on towers three and four building 11 passed but the tenting failed due to piping that needs "boxed" in in locations in each apartment as discussed. Piping can be covered on the first and second floors. Piping can not be covered on third floor until tenting is modified. ]Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in2/24/20202/25/20202/25/2020APASS
DetailsTroy Cobbley
Rough-in and tenting passed for the south half of tower 3. Piping is ok for cover. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in2/13/20202/14/20202/14/2020APASS
DetailsTroy Cobbley
Rough/Tenting on Tower 1 ; 2, is passed. Piping can be covered.

call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in2/10/20202/11/20202/11/2020ACANC
DetailsTroy Cobbley
Cancel per James. Call James before heading out. Rough and tenting towers 1 ; 2 Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in2/10/20202/10/20202/10/2020PCANC
DetailsJim Page
Point of contact called before inspection stating the drawings on site were not approved and will reschedule. GR

Call before heading out, rough and tenting towers 1;2 Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Plan Modification Accepted  2/6/2020 DONE
Alicia request the work flow to be opened for plan mod
Plan assigned to (Stumbaugh)2/6/2020 2/6/2020 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check2/6/2020 2/6/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/6/2020 PASS
DetailsMark Stumbaugh
Review Time 1 hr
12 new devices
Permit Ready to Issue  2/6/2020 DONE
plan mod approved
CHANGE STATUS TO (ISS)  2/6/2020 DONE
plan mod approved
INSP-Sprinkler Rough-in1/29/20201/29/20201/29/2020PFAIL
DetailsTroy Cobbley
need plan mods/as-builts showing the pipe routing changes, need the tenting repaired. No piping can be covered yet.

Ready any time, call James before heading out. Overhead rough and tenting. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in1/27/20201/28/20201/28/2020PCANC
DetailsJim Page
Rough and tenting, call James before heading out. Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in1/24/20201/24/20201/24/2020PCANC
DetailsTroy Cobbley
Towers 1 & 2 Overhead Rough and Tenting. Call James before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in1/21/20201/21/20201/21/2020PCANC
DetailsTroy Cobbley
Cancel per James.

Call James before heading out, for Tower 1 only. (4 towers on this building) Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Issue and Print Permit  11/12/2019 DONE
Sprinkler Plan Check10/29/2019 11/5/2019 PASS
DetailsMark Stumbaugh
1st review completed  11/5/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  11/5/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  11/5/2019 DONE
met
Application received  10/29/2019 DONE
Application submitted via PDS Online on Oct 29 2019 12:47PM
Intake Approval  10/29/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/29/2019 10/29/2019 DONE
DetailsMark Stumbaugh